FIELD: mining, oil and gas industry, particularly well drilling.
SUBSTANCE: method involves well drilling with the use of accumulation operation. Space free of combustible or explosive mix is created inside combustion chamber of drilling bit before combustible or explosive mix ignition. The space is created by cyclic or continuous injection of fuel and oxidizer or explosive composition components in the chamber at an angle to combustion chamber axis. The space may be also formed by alternate delivery and ignition of explosive charges. The explosive charges are provided with recesses.
EFFECT: increased speed and simplicity and reduced drilling costs.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
CUMULATIVE DRILLING METHOD | 2018 |
|
RU2691182C1 |
METHOD OF CUMULATIVE COMBUSTION OF PROPELLANT IN JET ENGINES | 2001 |
|
RU2216642C2 |
DEVICE FOR CUMULATIVE WELL DRILLING | 2009 |
|
RU2426856C2 |
METHOD OF CUMULATING ELECTRO-HYDRAULIC IMPACT AND DEVICE FOR ELECTRO-HYDRAULIC DRILLING | 2007 |
|
RU2351762C1 |
BOGDANOV'S METHOD OF SHAPED CHARGE DRILLING AND DEVICE FOR ITS REALISATION | 2012 |
|
RU2491402C1 |
PERISTALTIC PUMP | 2015 |
|
RU2591363C1 |
PERISTALTIC PUMP | 2016 |
|
RU2622221C1 |
PERISTALTIC PUMP | 2016 |
|
RU2622217C1 |
METHOD TO CREATE ELEMENTS OF STRUCTURES FOR CONSTRUCTION OF MARINE CITY | 2012 |
|
RU2509840C1 |
CHECK VALVE | 2019 |
|
RU2691282C1 |
Authors
Dates
2007-01-20—Published
2005-06-27—Filed