FIELD: oil industry, possible use during thermo-cyclic treatment of collector rock during processing of face-adjacent zone of bed.
SUBSTANCE: in accordance to method during processing of face-adjacent bed zone with sand collector, heating and cooling are performed cyclically. Heating is performed during 1,5-2,5 hours up to temperature of 80-90°C, cooling - during 0,5-0,75 hours up to temperature of 20-25°C. Number of cycles is set equal to 5-10.
EFFECT: increased efficiency of processing due to increased porosity and penetrability of productive bed collector.
1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR IMPROVEMENT OF PERMEABILITY OF SALINE LOW-PERMEABILITY OIL FORMATION | 2013 |
|
RU2538549C1 |
METHOD FOR INTENSIFICATION OF OIL RECOVERY | 1993 |
|
RU2066744C1 |
ACID WELL BOTTOM ZONE TREATMENT METHOD | 2006 |
|
RU2286446C1 |
METHOD FOR ENERGY-CYCLIC TREATMENT OF WELL IN BED OF NONUNIFORM PERMEABILITY | 1997 |
|
RU2134776C1 |
METHOD FOR TREATING BOTTOMHOLE AND REMOTE ZONES OF OIL AND GAS BEARING FORMATION | 2023 |
|
RU2813270C1 |
METHOD FOR DYNAMIC BOTTOMHOLE ZONE TREATMENT IN HIGH-TEMPERATURE LOW-PERMEABLE RESERVOIRS | 2006 |
|
RU2322578C2 |
METHOD TO ISOLATE HIGHLY-PERMEABLE WELL BOTTOM ZONE AREAS | 2005 |
|
RU2301884C1 |
METHOD FOR REAGENT-WAVE HYDROPERCUSSION TREATMENT OF BOREHOLE ZONE OF RESERVOIRS WITH HARD-TO-RECOVER OIL RESERVES | 2021 |
|
RU2769862C1 |
TREATMENT METHOD OF PRODUCTIVE FORMATION, AND DOWNHOLE EQUIPMENT FOR ITS IMPLEMENTATION | 2010 |
|
RU2478778C2 |
METHOD FOR REACTANT-WAVE TREATMENT OF BOTTOMHOLE FORMATION ZONE WITH FILTRATION PRESSURE WAVES | 2014 |
|
RU2584253C2 |
Authors
Dates
2007-03-10—Published
2005-10-07—Filed