METHOD FOR ISOLATION OF FORMATION WATER INFLOW IN WELL Russian patent published in 2007 - IPC E21B33/14 

Abstract RU 2296209 C1

FIELD: oil industry, particularly methods or devices for cementing, for plugging holes, crevices, or the like.

SUBSTANCE: method involves performing injection of flowable cement mortar through flexible flush-joint pipe of coiled tubing assembly into hole annuity; performing time-delay to provide cement hardening. The flexible flush-joint pipe is made as pipe having diameter of not more than 32 mm. Pipe with lesser diameter is lowered into hole annuity from ground surface between surface casing and production string. Cement mortar has density and pressure experimentally selected in dependence of length of pipe to be lowered. Cement mortar fills pipe interior and hole annuity up to day surface level. During cement hardening pipe is left in hole annuity. After cement hardening the pipe is cut at day surface level.

EFFECT: increased simplicity due to elimination of cement bridge forming in well.

1 ex

Similar patents RU2296209C1

Title Year Author Number
METHOD OF INSULATING FORMATION WATER INFLOW 2003
  • Godzjur Ja.I.
  • Kustyshev A.V.
  • Kustyshev I.A.
  • Gejkhman M.G.
  • Afanas'Ev A.V.
RU2244115C1
WELL REPAIR METHOD 2004
  • Ibragimov Nail' Gabdulbarievich
  • Zakirov Ajrat Fikusovich
  • Nikitin Vasilij Nikolaevich
  • Ozheredov Evgenij Vital'Evich
RU2280754C1
WELL BOTTOM ZONE TREATMENT METHOD 2004
  • Ibragimov N.G.
  • Kormishin E.G.
  • Isakov V.S.
  • Sharikov G.N.
  • Chupikova I.Z.
  • Torikova L.I.
RU2261991C1
METHOD OF CEMENT BRIDGE FORMING IN WELL 2003
  • Kustyshev I.A.
  • Godzjur Ja.I.
  • Kustyshev A.V.
RU2235852C1
METHOD FOR ISOLATING THE INFLOW OF FORMATION WATER IN AN UNCASED HORIZONTAL SECTION OF THE WELLBORE 2017
  • Leontev Dmitrij Sergeevich
  • Kleshchenko Ivan Ivanovich
  • Yagafarov Alik Kayumovich
  • Leonteva Natalya Alekseevna
  • Zhigalkovskaya Mariya Igorevna
  • Spekhova Svetlana Aleksandrovna
  • Zhaparova Darya Vladimirovna
RU2661171C1
METHOD FOR ISOLATION OF FORMATION WATER INFLUX AT SECTIONS OF THEIR SUPPLY IN WELLS WITH HORIZONTAL TERMINATION 2019
  • Leontev Dmitrij Sergeevich
RU2707109C1
INSTALLATION METHOD OF CEMENT BRIDGE IN WELL 2016
  • Makhmutov Ilgizar Khasimovich
  • Salimov Oleg Vyacheslavovich
  • Ziyatdinov Radik Zyauzyatovich
RU2644360C1
METHOD OF INSTALLING CEMENT BRIDGING PLUG IN WELL WITH OPENED PERFORATION INTERVAL 2002
  • Akhmetov A.A.
  • Dudov A.N.
  • Moskvichev V.N.
  • Kul'Kov A.N.
  • Kirjakov G.A.
  • Govdun V.V.
  • Chebysheva A.V.
RU2198998C1
METHOD OF WASHING OF SAND PLUG AND PREVENTION OF ADDITION OF SAND IN WATER PRODUCER UNDER CONDITIONS OF LIFTING OF GAS-WATER CONTACT 2007
  • Kustyshev Aleksandr Vasil'Evich
  • Dubrovskij Nikolaj Danilovich
  • Kustyshev Igor' Aleksandrovich
  • Krjakvin Dmitrij Aleksandrovich
  • Vaganov Jurij Vladimirovich
  • Korotchenko Andrej Nikolaevich
RU2341645C1
METHOD FOR ISOLATING BEDS DURING FASTENING OF OPERATION COLUMN 2005
  • Giljazov Rail' Masalimovich
  • Rakhmatullin Marat Raifovich
  • Gibadullin Nail' Zakuanovich
  • Rakhimkulov Rashit Shagizjanovich
  • Bochkarev German Panteleevich
  • Ogarkova Ehl'Vira Ivanovna
RU2295626C2

RU 2 296 209 C1

Authors

Ibragimov Nail' Gabdulbarievich

Ismagilov Fanzat Zavdatovich

Taziev Mirgazijan Zakievich

Zakirov Ajrat Fikusovich

Nikitin Vasilij Nikolaevich

Dates

2007-03-27Published

2005-12-06Filed