FIELD: oil extractive industry, namely, methods for processing heterogeneous oil deposits with usage of adjustment of filtration flow directions and increase of washing properties of agent being forced in.
SUBSTANCE: method includes successive forcing of gas and buffers of water-gas mixture through two force wells. Forcing is performed in two stages. At first stage, gas is simultaneously forced into both force wells until beginning of stable increase of gas factor of at least one extractive well of stock. At second stage, cyclic alternating forcing of buffers of water-gas mixture is performed, while each cycle is started with forcing in of buffer, consisting of water with surfactant and gas, with gas content 2-3 times exceeding gas content of mixture of basic-optimal composition, into force well with greater pickup, and buffer, consisting of water and gas, with base gas content of 25% in thermobaric conditions of deposit being studied, into force well with lesser pickup. After that water buffers are forced into force wells in volumes, equal to 5% of volume of pores of treatment area of each well. Force well for forcing in buffer of mixture with greater gas content and force well for forcing in a buffer of mixture with lesser gas content are selected when forcing in the water buffer. Used as surfactant are nonionic surfactants of ОН-10 and АФ9-12 types with content of water-gas mixture in water phase being forced in ranging from 0,1 to 5% of mass %.
EFFECT: increased oil recovery due to increased coefficients of displacement and area of effect of displacement.
2 cl, 1 ex
Title | Year | Author | Number |
---|---|---|---|
OIL DEPOSIT DEVELOPMENT METHOD | 2009 |
|
RU2498056C2 |
METHOD OF OIL DEPOSIT DEVELOPMENT BY WATER AND GAS INJECTION | 2013 |
|
RU2527432C1 |
METHOD FOR DEVELOPMENT OF OIL FRINGE OF OIL-AND-GAS DEPOSIT OF BOTTOM TYPE | 2019 |
|
RU2728753C1 |
OIL RECOVERY METHOD | 2007 |
|
RU2326234C1 |
METHOD FOR FORMATION WATER-GAS SIMULATION DURING OIL DEPOSITS DEVELOPMENT | 2016 |
|
RU2613404C1 |
OIL DEPOSIT DEVELOPMENT METHOD | 2004 |
|
RU2299979C2 |
METHOD AND DEVICE FOR OIL POOL DEVELOPMENT | 2003 |
|
RU2266396C2 |
DEVELOPMENT PROCESS OF PETROLEUM DEPOSIT | 2007 |
|
RU2326235C1 |
METHOD TO DEVELOP OIL DEPOSIT WITH GAS CAP (VARIANTS) | 2006 |
|
RU2312983C1 |
METHOD FOR DEVELOPMENT OF OIL DEPOSIT AT LATE STAGE OF OPERATION | 1998 |
|
RU2139419C1 |
Authors
Dates
2007-04-20—Published
2005-07-11—Filed