FIELD: oil and gas.
SUBSTANCE: invention is referred to oil producing industry and can be used on reservoirs with considerable oil-filled thickness. According to the method the water gas mixture injection through fill-in wells and production bleeding through exploitation wells are conducted. As fill-in and exploitation wells the holes with horizontal holes in a pay are used. Horizontal holes are drilled in a bottom part of a productive part of a formation in one plain the one over another along a major axis of a field. Horizontal holes of fill-in wells are positioned over horizontal holes of exploitation wells. A water gas mixture injection is made cyclically; a cyclic injection is executed by pressure alteration of inflating on fill-in wells. As water gas mixture the water gas mixture is injected at an optimum ratio of volume of water and gas injection, determined from a proportionality condition of volumes rate of small pores less than the medium size and of large pores more than the medium size in a header. Thus at first an injection of a water gas mixture bank with enriched gas is conducted, and then an injection of water gas mixture with lean gas is conducted. Water gas mixture injection is alternated with water injection.
EFFECT: increase of formation sweep by affecting and due to it accretion of an oil field recovery.
1 ex, 4 tbl, 2 cl
Title | Year | Author | Number |
---|---|---|---|
DEVELOPMENT METHOD FOR OIL FIELD HAVING BOTTOM WATER | 2006 |
|
RU2307239C1 |
DEVELOPMENT PROCESS OF PETROLEUM DEPOSIT | 2007 |
|
RU2326235C1 |
DEVELOPMENT OF OIL DEPOSIT BY HEAT AND WATER-GAS IMPACTS IN VERTICAL, HORIZONTAL AND MULTIHOLE WELLS SYSTEM | 2013 |
|
RU2524580C1 |
METHOD OF OIL DEPOSIT DEVELOPMENT BY THERMAL AND WATER-GAS SIMULATION | 2013 |
|
RU2534306C1 |
METHOD TO DEVELOP OIL DEPOSIT WITH GAS CAP (VARIANTS) | 2006 |
|
RU2312983C1 |
METHOD FOR DEVELOPMENT OF OIL FRINGE OF OIL-AND-GAS DEPOSIT OF BOTTOM TYPE | 2019 |
|
RU2728753C1 |
METHOD OF OIL POOL DEVELOPMENT WITH GAS CAP AND BOTTOM WATER | 2008 |
|
RU2386804C1 |
METHOD OF HYDROCARBONS DEPOSIT DEVELOMPENT IN LOW-PERMEABILITY SEDIMENTS | 2015 |
|
RU2625829C2 |
DEVELOPMENT METHOD OF OIL FRINGE IN CARBONATE RESERVOIR OF COMPLEX STRUCTURE | 2012 |
|
RU2509878C1 |
OIL DEPOSIT DEVELOPMENT METHOD | 2009 |
|
RU2498056C2 |
Authors
Dates
2008-06-10—Published
2007-07-16—Filed