FIELD: mining industry, possible use during underground extraction of mainly ore formations and kimberlite pipes.
SUBSTANCE: ore chute is provided with elastic, closed covers positioned pair-wise along the height of ore chute shaft and filled with compressed air. They are held on armored hermetic cable for feeding compressed air and on rope. Cover pairs adjacent height-wise are positioned transversely to each other. Diameter d of cover is selected from inequality d>0,5D, where D - diameter or transverse diameter of ore chute. Distance between adjacent pairs of covers vertical-wise along height h is calculated from formula h=10+1/dp, where dp - average diameter of rock mass piece, meters.
EFFECT: decreased degree of size reduction of rock mass, decreased costs of major repairs of ore chute, reduced speed of rock mass during transfer through ore chutes of practically any height.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
ORE PASS | 2004 |
|
RU2272135C1 |
ORE PASS | 2004 |
|
RU2272148C1 |
ORE AND ROCK CHUTE | 1990 |
|
RU2034992C1 |
STOWING OPERATIONS PERFORMING METHOD | 2009 |
|
RU2426886C1 |
DEVELOPMENT METHOD OF ORE DEPOSITS WITH BLOCK CAVING SYSTEM WITH ACTIVE FLEXIBLE SEPARATING COVERING | 2009 |
|
RU2426881C1 |
PROCESS FILLING WORKED-OUT AREA | 2002 |
|
RU2229607C1 |
ORE CHUTE | 0 |
|
SU1273610A1 |
SHAFT PNEUMATIC BRIDGING | 2006 |
|
RU2395692C2 |
MINE CONSTRUCTION METHOD | 0 |
|
SU1145144A1 |
BOOM | 2011 |
|
RU2475589C1 |
Authors
Dates
2007-04-27—Published
2005-11-07—Filed