FIELD: enhanced recovery methods for obtaining hydrocarbons, particularly from watered oil beds.
SUBSTANCE: method involves performing cyclic flooding of deposit beds through injection wells and producing oil through producing wells. To implement above method non-exhausted oil deposit zones located between injection wells are brought into development within seven-spot well pattern. Oil deposit is separated into triangular areas so that injection wells 1, 2, 3 are arranged at triangle apexes. Deposit bed flooding is carried out simultaneously through injection wells 1, 2 for 1/3 of flooding cycle duration, then through injection wells 2, 3 for next 1/3 of flooding cycle time and through injection wells 3, 1 for the last 1/3 of flooding cycle duration. Then flooding cycle is repeated in selected direction.
EFFECT: increased reservoir recovery.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DEVELOPING THE OIL DEPOSIT | 2017 |
|
RU2670313C1 |
METHOD OF OIL-FIELD MANAGEMENT | 2009 |
|
RU2390628C1 |
METHOD OF DEVELOPING OIL DEPOSITS IN FRACTURED RESERVOIRS | 2007 |
|
RU2351752C1 |
OIL RESERVOIR DEVELOPMENT METHOD (VARIANTS) | 2004 |
|
RU2267009C2 |
METHOD FOR DEVELOPMENT OF HIGH-WATER-CUT OIL DEPOSIT | 2024 |
|
RU2825909C1 |
OIL DEPOSIT DEVELOPMENT METHOD | 2019 |
|
RU2717847C1 |
METHOD FOR EXTRACTING OIL DEPOSIT WITH CARBONATE MANIFOLDS OF LOW PRODUCTIVENESS | 2002 |
|
RU2227207C2 |
PROCESS OF EXPLOITATION OF OIL FIELD | 2000 |
|
RU2159324C1 |
OIL DEPOSIT DEVELOPMENT METHOD | 2010 |
|
RU2425964C1 |
HOSE OIL DEPOSIT DEVELOPMENT METHOD | 2010 |
|
RU2425965C1 |
Authors
Dates
2007-05-20—Published
2002-11-18—Filed