FIELD: construction, particularly to consolidate ground at building base and poorly stable slopes with the use of jet technology.
SUBSTANCE: method involves determining characteristics of geological elements in geological section of ground massif to be consolidated as distribution member moves from pilot well bottom to upper part thereof, wherein the pilot well is drilled in ground to be consolidated. Geological element characteristics, namely twisting moment and drilling string compression force, are recorded during pilot well drilling. Ground is consolidated in pilot well with distribution member advancing speed determined from mathematical equation. If ground type is changed distribution member advancing speed is regulated.
EFFECT: possibility of ground consolidation by complex ground-and-cement column creation in dependence of ground strength and decreased erection time.
2 tbl
Title | Year | Author | Number |
---|---|---|---|
DRILL STRING FOR ERECTION OF BORED PILE IN SOIL-CEMENT CLADDING | 2019 |
|
RU2735077C1 |
METHOD FOR ERECTION OF BORED PILE IN SOIL-CEMENT COATING | 2019 |
|
RU2720047C1 |
METHOD FOR ERECTION OF BORED PILE WITH SOIL-CEMENT BROADENINGS IN WEAK SOILS ZONE AND DEVICE FOR ITS IMPLEMENTATION (VERSIONS) | 2019 |
|
RU2725363C1 |
METHOD FOR CAST-IN-PLACE PILE ERECTION | 2005 |
|
RU2303102C1 |
METHOD TO MEASURE SUBSIDENCE OF FOUNDATIONS AND DEVICE FOR ITS REALISATION | 2009 |
|
RU2413055C1 |
DEVICE OF HYDROMONITOR DRILLING HEAD FOR HORIZONTAL DIRECTIONAL DRILLING | 2022 |
|
RU2795008C1 |
PROCESS OF EARTH FIXING | 2001 |
|
RU2209267C1 |
METHOD TO DETERMINE PARAMETERS OF PILLARS ERECTED IN SOIL BY METHOD OF JET GROUTING | 2011 |
|
RU2461682C1 |
METHOD TO ERECT COMBINED PILE AND ITS DESIGN | 2011 |
|
RU2486315C2 |
METHOD OF THE PILE FOUNDATION ARRANGEMENT IN THE PERMAFROST SOIL | 2017 |
|
RU2653193C1 |
Authors
Dates
2007-07-20—Published
2005-12-01—Filed