METHOD FOR ERECTION OF BORED PILE WITH SOIL-CEMENT BROADENINGS IN WEAK SOILS ZONE AND DEVICE FOR ITS IMPLEMENTATION (VERSIONS) Russian patent published in 2020 - IPC E02D5/34 

Abstract RU 2725363 C1

FIELD: construction.

SUBSTANCE: invention relates to construction, namely to methods of fixing soils of buildings and structures bases, and can be used in formation of pile foundations of structures for various purposes in weak water-saturated soils. Method of erection of bored pile with soil-cement broadenings in zone of weak soils includes driving of well with hollow auger with drilling tool equipped with lines supplying high-pressure water-cement solution from pump unit to dispensing element with jet-forming nozzles, which is placed inside hollow screw, having side windows for jet-forming nozzles of dispensing element, as well as recording system of change of mechanical properties of soils, which make up drilled mass, with subsequent formation of soil-cement shell with broadenings in zone of weak soils, which are created in accordance with characteristics of soils determined during drilling, by supplying high-pressure cementing solution through distributing element with jet-forming nozzles. After reaching the design depth of the designed depth from the drilled well, the dispensing element and the drilling tool are removed, into the cavity of the screw the reinforcement frame is lowered and the well is filled with cast-in-consist with concrete to the wellhead, after that, gradual lifting of hollow screw with its unscrewing and simultaneous supply of concrete mixture to well with compaction by pulse discharges till complete filling of formed space. In accordance with the characteristics of soil determined during drilling and formation of soil-cement shell with broadenings in the area of weak soils, a reinforcement frame with side inserts is made, comprising reinforcing rods with hinges of the first type and springs, which enable reinforcement rods of side inserts to fill in side broadenings, as well as with end insert containing welding and thrust rings with first-type hinges and reinforcement rods, which, under action of reinforcement carcass weight and indentation fill end broadening, after which reinforcing frame is lowered into hollow auger, which gradually with unscrewing raise, and as opening and filling reinforcement rods with hinges of the first type of side and end inserts of broadenings of soil-cement shell in zone of weak soils is supplied to concrete mixture to well until complete filling of formed space.

EFFECT: technical result consists in ensuring removal of process settling and increasing bearing capacity and quality of bored pile with soil-cement broadenings in zone of weak soils.

3 cl, 23 dwg

Similar patents RU2725363C1

Title Year Author Number
DRILL STRING FOR ERECTION OF BORED PILE IN SOIL-CEMENT CLADDING 2019
  • Mikhajlov Aleksandr Nikolaevich
  • Pushkarev Aleksandr Evgenevich
  • Sokolov Nikolaj Sergeevich
  • Sokolov Sergej Nikolaevich
  • Sokolov Andrej Nikolaevich
RU2735077C1
METHOD FOR ERECTION OF BORED PILE IN SOIL-CEMENT COATING 2019
  • Sokolov Nikolaj Sergeevich
  • Mikhajlov Aleksandr Nikolaevich
  • Pushkarev Aleksandr Evgenevich
  • Sokolov Sergej Nikolaevich
  • Sokolov Andrej Nikolaevich
RU2720047C1
METHOD FOR CONSTRUCTING DRILLED PILE IN PERMAFROST SOIL 2023
  • Popsuenko Ivan Konstantinovich
  • Alekseev Andrei Grigorevich
  • Zorin Dmitrii Vasilevich
RU2803751C1
METHOD FOR CAST-IN-PLACE PILE ERECTION 2005
  • Arutjunov Igor' Sergeevich
  • Kalganov Aleksej Jur'Evich
  • Pushkarev Aleksandr Evgen'Evich
  • Pushkarev Vladimir Aleksandrovich
RU2303102C1
METHOD OF DRILL-INJECTION STILT FORMATION 2006
  • Popsuenko Ivan Konstantinovich
RU2327007C1
BORED PILE WITH WIDENING 2023
  • Fomenko Nikolai Aleksandrovich
  • Abramian Susanna Grantovna
  • Oganesian Oganes Valerevich
  • Fomenko Vladislav Nikolaevich
RU2824059C1
METHOD TO ERECT COMBINED PILE AND ITS DESIGN 2011
  • Kharisov Il'Nur Zjamilevich
  • Babich Dmitrij Sergeevich
  • Latypov Ruslan Rasulovich
RU2486315C2
METHOD FOR CONSTRUCTION OF PILE AND COLUMNAR FOUNDATIONS IN PERMAFROST ZONE 2023
  • Mazur Evgenii Vitalevich
  • Panchenko Aleksandr Ivanovich
  • Pestriakova Ekaterina Alekseevna
  • Sonin Aleksandr Nikolaevich
  • Teliatnikova Natalia Aleksandrovna
  • Kharchenko Aleksei Igorevich
  • Kharchenko Igor Iakovlevich
  • Kharin Iurii Ivanovich
  • Piskunov Aleksandr Alekseevich
RU2813086C1
INJECTION PILE ERECTION METHOD 2005
  • Arutjunov Igor' Sergeevich
  • Bagdasarov Jurij Arshavirovich
RU2304198C2
METHOD TO MANUFACTURE BORED PILES AND DEVICE FOR ITS REALISATION 2012
  • Steshenko Dmitrij Mikhajlovich
RU2525896C2

RU 2 725 363 C1

Authors

Mikhajlov Aleksandr Nikolaevich

Pushkarev Aleksandr Evgenevich

Sokolov Nikolaj Sergeevich

Sokolov Sergej Nikolaevich

Sokolov Andrej Nikolaevich

Savchuk Aleksandr Dmitrievich

Dates

2020-07-02Published

2019-12-17Filed