FIELD: construction.
SUBSTANCE: method to determine parameters of pillars erected in soil by the jet grouting method including arrangement of a well for the entire length of a pillar with subsequent erosion under permanent flow rate and pressure of a working solution and speed of lifting and rotation of a hydraulic monitor until formation of a pillar and determination of pillar parameters in compliance with soil properties. In process of well arrangement a soil sample is taken with a coring device with a case, with length multiple to pillar diameter, afterwards the case with the soil sample is installed in the horizontal position and under the right angle with one end is rigidly connected to a cylindrical conductor, the cavity diameter of which complies with the well diameter, and the other end is closed with a cover equipped with a metering system. In the conductor cavity coaxially to the cartridge with a soil sample there is a hydraulic monitor installed, and sample soil is washed with a working solution under permanent pressure, afterwards using the time of soil sample washing, the speed of hydraulic monitor lift is determined, as well as the radius of the given pillar section, and afterwards values of technological parameters are set for generation of a pillar with specified parameters.
EFFECT: simplified method, reduced costs, higher accuracy to detect geometric parameters of cement soil pillars along the entire depth of pillar erection depending on soil properties.
4 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF THE PILE FOUNDATION ARRANGEMENT IN THE PERMAFROST SOIL | 2017 |
|
RU2653193C1 |
METHOD FOR ERECTION OF BEARING-CLADDING ANTIFILTRATION STRUCTURES IN SOIL AND DEVICE FOR ITS REALISATION | 2008 |
|
RU2378453C1 |
METHOD OF DEACTIVATION OF TERRITORY | 2011 |
|
RU2518530C2 |
PROCESS OF MANUFACTURE OF DRILL-INJECTED PILES WITH COMPACTED FACE | 2001 |
|
RU2188904C1 |
METHOD FOR MAKING CEMENT/SOIL PILES IN CAVED-IN SOILS | 1993 |
|
RU2054502C1 |
METHOD OF WELL HYDROMINING AT EXCAVATION WITH PRELIMINARY DRYING OF MINERALS | 2011 |
|
RU2499140C2 |
METHOD FOR LEVELLING NON-UNIFORMLY SETTLED BASE PLATE OR THREE-DIMENSIONAL SOLID FOUNDATION BLOCK | 2013 |
|
RU2545207C1 |
METHOD TO DETECT STRENGTH OF SOIL-CEMENT PILE | 2014 |
|
RU2556644C1 |
METHOD FOR PRODUCING A CLAY SOIL PILE | 2020 |
|
RU2767469C1 |
BUILDING METHOD OF WATERTIGHT SCREEN IN BUILT-UP AREAS | 2007 |
|
RU2349710C1 |
Authors
Dates
2012-09-20—Published
2011-02-24—Filed