FIELD: oil and gas production.
SUBSTANCE: whole process comprises primarily exposing well on polymer-chalk mortar, perforating bottom zone of formation under polymer-chalk mortar layer, creating acid-degradable protective shield in bottom zone by forcing polymer-chalk mortar under pressure exceeding specified cementation pressure by 10-15%. Thereafter, casing string is descended, annular space is cemented, and bottom zone of formation is re-perforated through casing string and protective layer is destroyed with acid. Polymer-chalk mortar has following composition, wt %: soda ash 1-6, carboxymethylcellulose 1-6, polyacrylamide 2-3, clay 48-52, chalk 46-50, water - the balance.
EFFECT: increased productivity of formation due to prevented negative action of drilling fluids and appearance of softened bottom zone.
Title | Year | Author | Number |
---|---|---|---|
DRILLING-IN METHOD | 2008 |
|
RU2347900C1 |
METHOD FOR PROCESSING BOTTOMHOLE FORMATION ZONE | 2017 |
|
RU2647136C1 |
WELL COMPLETION METHOD | 2005 |
|
RU2304697C1 |
METHOD FOR WELL COMPLETION | 1992 |
|
RU2054525C1 |
METHOD FOR RECOVERY OF RESERVOIR NATURAL PROPERTIES, IMPAIRED DURING ITS OPENING WITH BORING | 2008 |
|
RU2382188C1 |
WELL BOTTOM ZONE TREATMENT METHOD | 2005 |
|
RU2296217C1 |
METHOD OF OIL DEPOSIT DEVELOPMENT | 2008 |
|
RU2369724C1 |
PROCEDURE FOR DEVELOPMENT OF PAYABLE CARBONATE BED | 2010 |
|
RU2423604C1 |
INJECTION WELL OPERATION METHOD | 2007 |
|
RU2320856C1 |
METHOD OF SECONDARILY OPENING PRODUCTIVE FORMATION | 1995 |
|
RU2109790C1 |
Authors
Dates
2007-08-20—Published
2006-07-26—Filed