FIELD: oil-and-gas industry.
SUBSTANCE: invention related to methods for recovery of reservoir natural properties, contaminated with uncontrolled penetration of boring fluid and cement slurry filtrates into reservoir's bottomhole zone (BHZ), during the reservoir opening with boring and casing string cementing, creating stable water-oil emulsions, which blocks penetration intervals. In the method for recovery of reservoir natural properties, impaired during its opening with boring, which includes pumping composition of a surface active substance - SAS mixed with dissolver into reservoir interval, the composition over flushing into BHZ and process ageing execution; the composition contains wt %: "Oil-Plast 04" 0.8-1.6, sodium liquid glass 3-5, carboximetilcellulose 0.2-0.4, the rest is water: and after the composition over flushing into BHZ until hydrostatic equilibrium condition, pumping a clay composition into tubing string in volume 0.1-0.15 m3, but not exceeding a pressure 4 MPa on a cementing aggregate CA - 320 M manometre, repeat it several times, till pressure drop at the manometre stopped, preliminary sealing hole clearance by shutting wellhead discharge prevention equipment and lifting a drill column over the composition top level, execute process ageing, wash the well descending the sting until bottomhole.
EFFECT: process simplification and BHZ treatment cast cutting.
Title | Year | Author | Number |
---|---|---|---|
RECOVERY METHOD FOR NATURAL RESERVOIR PERFORMANCE DETERIORATED DURING WELL CONSTRUCTION | 2012 |
|
RU2534171C2 |
METHOD FOR RECOVERY OF FILTRATION AND CAPACITY PROPERTIES OF OIL-BEARING COLLECTOR HAVING DETERIORATED DURING WELL CONSTRUCTION COMPLETION | 2009 |
|
RU2392423C1 |
PROCEDURE FOR DEVELOPMENT OF PAYABLE CARBONATE BED | 2010 |
|
RU2423604C1 |
METHOD FOR LIQUIDATION OF ABSORPTION ZONES IN WELL | 2010 |
|
RU2405927C1 |
TREATMENT METHOD FOR WELL BOTTOMHOLE PRODUCTIVE FORMATION ZONE CHARACTERIZED BY DIFFICULT-TO-RECOVER OIL | 2004 |
|
RU2283950C2 |
METHOD FOR STRING CEMENTING IN WELL USING CEMENT MORTAR WITH EROSION PROPERTIES | 2009 |
|
RU2398095C1 |
PROCEDURE FOR FIXING WELL WITH CEMENT GROUT | 2009 |
|
RU2398955C1 |
INSULATION METHOD OF WATER INFLUX AND WELL THIEF ZONE | 2008 |
|
RU2378490C1 |
METHOD FOR ISOLATION OF LOST CIRCULATION ZONE OF DRILLING MUD DURING OIL AND GAS WELLS | 2023 |
|
RU2825228C1 |
METHOD FOR PROCESSING BOTTOMHOLE FORMATION ZONE | 2014 |
|
RU2583104C1 |
Authors
Dates
2010-02-20—Published
2008-12-17—Filed