FIELD: oil and gas industry.
SUBSTANCE: invention is applicable to the oil producing industry and be of use for well completion. The drilling-in method includes penetrating a well using polymer mud, building an acid-decomposable protective screen in the reservoir bottomhole zone (RBHZ) by injecting the said mud, running casing, cementing casing annulus, perforating the RBHZ through the casing under a bed of the said mud, and destructing the said screen through acid treatment. During penetration it uses polymer solution at a density of 1040 to 1080 kg/m3 composed of, wt %: sodium carbonate 3-5, carboxymethyl cellulose (CMC) 3.5-5, polyacryl amide 2-3, marble powder 48-55, and water as balance for Early and Late Carboniferous formations; and polymer solution at a density of 1140 to 1300 kg/m3 composed of, wt %: sodium carbonate 3-5, CMC 4-5, xanthan gum 2-3, marble powder 60-80, and water as balance for Devonian terrigenous formations with high water salinity. During building it uses a mud-pulse system including pressurising, holding pressure for 5 to 10 minutes, and depressurising in the bottomhole zone, repeating this 10 to 15 times.
EFFECT: reduced negative effect drilling muds have on productive reservoirs during penetration, retained drilling mud parameters at various reservoir compositions, and a simplified process for artificial clogging of a bottomhole zone within a production interval.
4 tbl, 1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR PROCESSING BOTTOMHOLE FORMATION ZONE | 2017 |
|
RU2647136C1 |
METHOD OF TREATING BOTTOM ZONE OF FORMATION | 2006 |
|
RU2304698C1 |
METHOD FOR RECOVERY OF RESERVOIR NATURAL PROPERTIES, IMPAIRED DURING ITS OPENING WITH BORING | 2008 |
|
RU2382188C1 |
METHOD OF KILLING OF OIL WELLS WITH HIGH GAS FACTOR IN PERMAFROST CONDITIONS | 2016 |
|
RU2616632C1 |
WELL COMPLETION METHOD | 2004 |
|
RU2280752C2 |
INJECTION WELL OPERATION METHOD | 2007 |
|
RU2320856C1 |
METHOD FOR DRILLING AND PRIMARY OPENING OF PRODUCTIVE LAYERS | 2020 |
|
RU2753910C1 |
METHOD FOR WELL CONSTRUCTION IN COMPLICATED CONDITIONS | 2016 |
|
RU2630519C1 |
RECOVERY METHOD FOR NATURAL RESERVOIR PERFORMANCE DETERIORATED DURING WELL CONSTRUCTION | 2012 |
|
RU2534171C2 |
WELL COMPLETION METHOD | 2015 |
|
RU2580565C1 |
Authors
Dates
2009-02-27—Published
2008-01-29—Filed