FIELD: road building, particularly methods or arrangements for preventing slipperiness or protecting against influences of the weather.
SUBSTANCE: method involves providing double surface treatment, including treating ballast with bitumen, dispersing treated ballast in two layers over road and compacting thereof along with bitumen pouring over each ballast layer. Ballast made of main rock or slag ballast is used. Before ballast treatment with bitumen limestone or slag screenings in amount of 30-40% of ballast mass are added to the ballast. The obtained bitumen-mineral mix is dispersed in hot state and compacted.
EFFECT: improved quality and service life of pavement coating and simplified protective coating forming technology.
1 cl, 4 ex, 2 tbl
Title | Year | Author | Number |
---|---|---|---|
CRUSHED STONE MASTIC ASPHALT CONCRETE MIXTURE AND METHOD OF ITS PRODUCTION | 2011 |
|
RU2474595C1 |
CRUSHED STONE-MASTIC ASPHALT-CONCRETE MIX AND METHOD OF ITS OBTAINING | 2011 |
|
RU2476397C2 |
ASPHALT-CONCRETE MIXTURE | 2012 |
|
RU2522497C1 |
BITUMINOUS CONCRETE MIXTURE ON BASIS OF MODIFIED BITUMEN FOR HIGHWAY COATING | 2015 |
|
RU2613068C1 |
BITUMINOUS CONCRETE MIXTURE ON BASIS OF MODIFIED BITUMEN FOR HIGHWAY COATING | 2015 |
|
RU2613211C1 |
CAST REINFORCED FIBRE ASPHALT CONCRETE | 2014 |
|
RU2564707C1 |
BITUMEN-MINERAL MIXTURE | 1997 |
|
RU2167118C2 |
ASPHALT CONCRETE MIXTURE AND METHOD FOR ITS PREPARING | 2003 |
|
RU2277519C2 |
METHOD TO MAKE CRUSHED STONE AND MASTIC ASPHALT CONCRETE MIXTURE WITH ADDITION OF LIMESTONE GRINDING SIFTINGS OF BRAND 400 | 2009 |
|
RU2426704C2 |
BITUMEN/MINERAL OPENED MIXTURE | 2004 |
|
RU2267465C1 |
Authors
Dates
2007-09-10—Published
2005-12-12—Filed