FIELD: oil producing industry; installations for the fields oil treatment.
SUBSTANCE: the invention is pertaining to oil producing industry, in particular, to the installations for the fields oil treatment. The installation for the oil treatment includes: the oil pipeline, the first stage of the oil treatment with the end divider of the stages (EDS) and the tank of the water preliminary discharge connected with the treatment facilities by the water discharge pipeline; the second stage of the oil treatment with the pipeline of the withdrawal of the low-mineralized semi-commercial water, which is connected to the oil pipeline; the heat exchanger installed on the oil pipeline after the first stage. EDS is supplied with the water discharge pipeline, which is connected to the pipeline of the water discharge from the tank of the preliminary water discharge before the treatment facilities, and the pipeline of the withdrawal of the low-mineralized semi-commercial water is connected to the oil pipeline before the tank of the preliminary water discharge. The treatment facilities are additionally supplied with the oil withdrawal pipeline, which is also connected with the oil pipeline located before the tank of the preliminary discharge of the water. On the water discharge pipeline located before the treatment facilities and on the oil pipeline located between EDS and the preliminary water discharge tank correspondingly there are the first and second heat exchangers, which are accordingly and sequentially connected to the heat exchanger of the second stage. The technical result of the invention is cooling of the finished commercial oil to the temperature of 30°С before its transfer to the oil stock accounting site; the increased efficiency of operation of the preliminary water discharge tank up to the water share in the oil of no more than 0.5 %; the increased degree of treatment of the oil-field water, the reduced power input.
EFFECT: the invention ensures cooling of the finished commercial oil to the temperature of 30°С before its transfer to the oil stock accounting site; the increased efficiency of operation of the preliminary water discharge tank up to the water share in the oil of no more than half percent; the increased degree of treatment of the oil-field water; the reduced power input.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
PETROLEUM PREPARATION PLANT | 1993 |
|
RU2104739C1 |
PLANT FOR TREATMENT OF HEAVY ASPHALT-RESINOUS OIL | 2000 |
|
RU2164435C1 |
INSTALLATION FOR TREATMENT OF HEAVY OIL AND NATURAL BITUMEN | 2007 |
|
RU2356595C1 |
METHOD OF COLLECTING AND PREPARING OIL | 2006 |
|
RU2315644C1 |
OIL COLLECTION AND TREATMENT SYSTEM | 2009 |
|
RU2412739C1 |
CARBON SULPHIDE-CONTAINING OIL TREATMENT PLANT | 2010 |
|
RU2424035C1 |
HEAVY OIL TREATMENT PLANT (VERSIONS) | 2011 |
|
RU2471853C1 |
METHOD OF OIL TREATMENT | 2007 |
|
RU2333350C1 |
UNIT FOR COLLECTING AND PREPARING OIL | 0 |
|
SU1029984A1 |
INSTALLATION FOR TREATMENT OF OIL CONTAINING HYDROGEN SULPHIDE | 2015 |
|
RU2578155C1 |
Authors
Dates
2007-09-20—Published
2006-02-09—Filed