FIELD: construction of pipeline transport.
SUBSTANCE: invention can be used in laying underwater pipeline or tunnel. Route for watercraft used in laying underwater pipeline is marked by beacons. Watercraft is secured, pipeline is assembled and sinkers in form of rings are fitted on. Rubber rollers are placed on inner surface of rings. Pipes are placed on supports - boring piles preliminarily secured on bottom. Beam with attachment members is installed on each pair of piles, and cradle is laced on beam. After mounting of pipeline, it is secured on support by means of clamps.
EFFECT: improved reliability of pipeline.
4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO INSTALL PIPE CANAL UNDER NORTHERN CONDITIONS | 2013 |
|
RU2539043C1 |
METHOD OF PIPELINE LAYING ON THE BED OF WATER BODY | 2016 |
|
RU2657372C2 |
SCREW PILE, SCREW PILE INSTALLATION METHOD, SCREW PILE DRIVING MEANS AND OPEN-CUT TUNNELING METHOD WITH THE USE OF SCREW PILE | 2005 |
|
RU2288326C1 |
METHOD FOR UNDERGROUND PASSAGE AND TUNNEL FORMING AND UNDERGROUND PASSAGE OR TUNNEL SECTION | 2006 |
|
RU2312187C1 |
METHOD FOR CONSTRUCTION OF FOUNDATION CARRYING HEAVY LOADS | 2005 |
|
RU2296837C2 |
SCREW PILE | 2006 |
|
RU2304664C1 |
SCREW PILE | 2005 |
|
RU2288325C1 |
DEVICE FOR PROVIDING DESIGN POSITION OF UNDERGROUND PIPELINE WHILE LAYING UNDER CONDITIONS OF PERMAFROST SOILS | 2016 |
|
RU2643914C1 |
METHOD OF TRENCH PIPELINE LAYING THROUGH RIVERS WITH HIGH WATER FLOW RATE | 2020 |
|
RU2724367C1 |
SUSPENSION SUPPORT FOR SECTIONS OF UNDERGROUND PIPELINE ROUTING | 2015 |
|
RU2601651C1 |
Authors
Dates
2007-10-20—Published
2006-03-23—Filed