FIELD: mining, particularly underground thick deposit, namely potassium salt and rock salt, mining.
SUBSTANCE: method involves drilling conveyer and vent drifts, as well as cut cross-drift and rise in surrounding massif; cutting chamber in layers in downward direction; cutting inclined conveyer rise, which connects conveyer drift with cut cross-drift near long side of design chamber contour; cutting recess in upper chamber layer adjoining inclined conveyer rise so that recess width is equal to face equipment movement; excavating chamber with several cuts formed in planes transversal to inclined conveyer rise plane; delivering the cut mineral directly to conveyer of conveyer rise. After the first slice cutting the second slice cutting is begun from recess excavation from inclined conveyer rise with conveyer shortage. Then the second slice is cut. Cycles of next chamber layer cutting are repeated.
EFFECT: increased speed of chamber reserve mining, decreased preparatory work amount and reduced losses.
9 dwg
Title | Year | Author | Number |
---|---|---|---|
SALT EXCAVATION METHOD | 2005 |
|
RU2279545C1 |
LAYERED ROOM-AND-PILLAR SYSTEM WITH COMPLETE STOWING | 2011 |
|
RU2486340C2 |
DEVELOPMENT METHOD OF THICK STEEPLY DIPPING ORE BODIES | 2012 |
|
RU2502872C1 |
METHOD OF MINERAL DEPOSITS MINING | 0 |
|
SU1809064A1 |
METHOD FOR EXTRACTION OF KIMBERLITE PIPE UNDER ELASTIC SHIELDS | 2003 |
|
RU2242611C1 |
METHOD OF DEVELOPING THICK STEEPLY DIPPING ORE BODIES | 2014 |
|
RU2558841C1 |
METHOD OF RISE RILL CUT MINING WITH FILLING OF PIPE-LIKE KIMBERLITE DEPOSITS BY POWDER MINING COMPLEX | 1998 |
|
RU2155868C2 |
METHOD OF MINING ORE DEPOSITS | 0 |
|
SU1751338A1 |
METHOD OF MINING AN UNSTABLE ORE DEPOSITS | 0 |
|
SU976069A1 |
METHOD FOR UNDERGROUND DEVELOPMENT OF STEEPING ORE BODIES IN DESCENTING ORDER WITH CHAMBER SYSTEM | 2022 |
|
RU2790648C1 |
Authors
Dates
2007-10-27—Published
2006-05-31—Filed