FIELD: mining industry; applicable in underground mining of pipe-like diamond deposits extended along the strike. SUBSTANCE: method includes driving of raise in central part of deposit. Driven on airway and haulage horizons are horizontal workings which are interconnected by intervals with vertical openings. Flank openings are located at distance from deposit contact equalling the length of powered support. Driven above haulage horizon with provision of pillar is mounting room for installation of powered mining complex. Driven round flank vertical openings from their both sides is common updip access road from which inclined slice is mined between flank vertical openings by powered mining complex using the miniface method (by short parallel stopes), and end parts of slice are worked during turning of powered mining complex. Simultaneously with idle travelling of powered mining complex, worked out slice is filled. Mounted in filled mass is support of shaft for ore drawing and servicing of powered mining complex. Fill is supplied through vertical opening above shaft. EFFECT: reduced ore losses in mining of extended deposits. 2 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF MINING OF TUBULAR KIMBERLITE DEPOSITS BY POWERED MINING COMPLEX | 1998 |
|
RU2153073C2 |
METHOD OF MINING KIMBERLITE DEPOSIT EXTENDED ALONG STRIKE BY INCLINED SLICING UNDER FLEXIBLE GUARD ROOFING BY POWERED MINING SET | 1998 |
|
RU2151295C1 |
METHOD AND POWERED COMPLEX FOR MINING KIMBERLITE PIPES | 1996 |
|
RU2116447C1 |
METHOD FOR DEVELOPMENT OF KIMBERLITE PIPES BY MECHANIZED COMPLEX | 1997 |
|
RU2135772C1 |
METHOD OF LAYER MINING OF KIMBERLITE PIPE BY RAISING AND FILLING | 2001 |
|
RU2186981C1 |
METHOD OF DOWNWARD WORKING OF KIMBERLITE PIPE BY POWERED MINING COMPLEX AND DESIGN OF FLEXIBLE GUARD ROOFING | 1998 |
|
RU2155867C2 |
PROCESS OF LAYER-BY-LAYER DEVELOPMENT OF KIMBERLITE PIPE IN ASCENDING ORDER WITH BACKFILL AND POWERED COMPLEX FOR METHOD EMBODIMENT | 2001 |
|
RU2203420C2 |
METHOD FOR EXTRACTION OF KIMBERLITE PIPE UNDER ELASTIC SHIELDS | 2003 |
|
RU2242611C1 |
METHOD FOR DEVELOPMENT OF KIMBERLITE PIPES IN PERMAFROST ZONE | 1997 |
|
RU2132462C1 |
METHOD FOR DEVELOPING KIMBERLITE PIPE IN ASCENDING PROCEDURE WITH DRY GOBBING | 1997 |
|
RU2132461C1 |
Authors
Dates
2000-09-10—Published
1998-04-06—Filed