FIELD: oil and gas production, particularly methods or devices for cementing, for plugging holes, crevices, or the like.
SUBSTANCE: method involves securing casing pipes by cementing thereof with cement mortar up to level located over productive reservoir roof; arranging composition having viscoelastic properties over cement mortar; placing plugging composition having setting time exceeding that of cement mortar over viscoelastic composition, wherein the plugging composition has density providing creation of hydrostatic pressure exceeding gas pressure in productive reservoir before hardening of cement mortar supplied within productive reservoir interval. Viscoelastic composition is poured so that viscoelastic composition height is not less than 10 m. The viscoelastic composition is clayless viscoelastic composition.
EFFECT: increased cementing reliability.
4 cl, 1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD OF HYDRODYNAMIC RESEARCH FOR GAS-BEARING FORMATIONS WITHOUT GAS RELEASE TO SURFACE | 2013 |
|
RU2527089C1 |
METHOD FOR PREVENTING OCCURRENCE OF INTER-CASING AND INTER-LAYER FLOWS IN WELL | 2023 |
|
RU2808074C1 |
METHOD FOR ISOLATING BEDS DURING FASTENING OF OPERATION COLUMN | 2005 |
|
RU2295626C2 |
WELL COMPLETION METHOD | 2015 |
|
RU2580565C1 |
METHOD OF WELL CASING | 1999 |
|
RU2178060C2 |
METHOD FOR ELIMINATING BEHIND-CASING FLOWS AND INTER-CASING PRESSURE IN OIL AND GAS WELLS | 2014 |
|
RU2550116C1 |
METHOD FOR WELL COMPLETION | 1990 |
|
RU2018629C1 |
METHOD FOR KILLING WELL WITH FIBERGLASS CASING | 2023 |
|
RU2811127C1 |
METHOD FOR AIR-TIGHTNESS RECOVERY IN CASING ANNULUS OF WELL DRILLED IN GAS POOL OR IN DEPOSIT CONTAINING GAS | 2004 |
|
RU2272890C1 |
METHOD OF CEMENTING OF WELLS WITH ABNORMALLY HIGH FORMATION PRESSURE | 1996 |
|
RU2100569C1 |
Authors
Dates
2007-12-20—Published
2006-05-17—Filed