FIELD: well completion. SUBSTANCE: method includes drilling-in, running casing into well, and injection of cement mortar. Injected between portions of cement mortar is portion of viscoelastic compound with stable properties. It is provided above producing formation under condition that hydrostatic pressure of columns of overlying portion of cement mortal and portion of viscoelastic compound exceeding formation pressure is transmitted to lower elevation of viscoelastic compound. EFFECT: higher efficiency due to provision of improved sealing of casing string-borehole annulus.
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR WELL CASING IN FLOW ROCKS | 1993 |
|
RU2066735C1 |
METHOD OF BOREHOLE FIXING | 1993 |
|
RU2057904C1 |
METHOD TO PREVENT GAS FLOW VIA ANNULUS DURING WELL CEMENTING | 2006 |
|
RU2312973C1 |
METHOD FOR CEMENTING CASING STRINGS | 1993 |
|
RU2061840C1 |
METHOD FOR KILLING WELL WITH FIBERGLASS CASING | 2023 |
|
RU2811127C1 |
METHOD FOR STEPPED CEMENTATION OF WELL IN HIGHLY PENETRABLE GAS-SATURATED COLLECTORS | 2003 |
|
RU2241819C1 |
WELL COMPLETION METHOD | 2015 |
|
RU2580565C1 |
METHOD OF GAS WELL COMPLETION | 2013 |
|
RU2534548C1 |
CASING ANNULUS PLUGGING METHOD | 2005 |
|
RU2286438C1 |
METHOD FOR SECONDARY OPENING OF PRODUCTIVE BED | 1996 |
|
RU2118445C1 |
Authors
Dates
1994-08-30—Published
1990-10-29—Filed