FIELD: hydrocarbon (oil, gas, gas-condensate, gas-hydrate) production and reservoir pressure maintenance in multiple fields, particularly simultaneous separate or alternate operation of several production and/or injection reservoir with single well.
SUBSTANCE: method involves lowering at least pipe string having constant or varying diameter in well, wherein the pipe string has opened or closed lower end and provided with at least one packer for reservoir isolation arranged between reservoirs or over reservoirs and between the reservoirs and with control device to control working agent injection and fluid production. Pipe string or control device lowered in injection or blower or gas-lift or pumping well comprises instrument transducer located at one reservoir level and adapted to transmit measurement information to ground surface and to determine technological parameters of injected working agent or produced fluid. For that cable or pulse pipe located inside or outside pipe string is lowered in well and pulse pipe is linked to instrument transducer or to control device or both to instrument transducer and to control device. The control device may be of fixed or removable type. After well head assemblage working agent is injected or fluid is produced via control device and instrument transducer. Measurement information is transmitter from instrument transducer to ground surface and technological parameters of working agent or reservoir fluid are determined. If said parameters differ from design values control device cross-section is changed to obtain design values of technological parameters for each reservoir.
EFFECT: increased efficiency of simultaneous separate or alternate operation of several production and/or injection reservoir with single well in multiple field.
14 cl, 9 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR CONCURRENT-SEPARATE OPERATION OF SEVERAL BEDS VIA ONE FORCE WELL IN TURNS | 2003 |
|
RU2253009C1 |
MULTI-RESERVOIR WELL SUMULTANIOUS-SEPARATE PRODUCTION METHOD | 2008 |
|
RU2380526C1 |
BOREHOLE PLANT FOR SIMULTANEOUS SEPARATE AND ALTERNATE OPERATION OF SEVERAL FORMATIONS BY SINGLE WELL | 2003 |
|
RU2262586C2 |
EQUIPMENT FOR MULTI-RESERVOIR WELL SUMULTANIOUS-SEPARATE RECEARCH AND PRODUCTION WITH ELECTIRCAL SUBMERSIBLE PUMP (VERSIONS) | 2008 |
|
RU2380522C1 |
METHOD OF DUAL OIL PRODUCTION FROM LAYERS OF ONE WELL WITH SUBMERSIBLE PUMP SET (VERSIONS) | 2007 |
|
RU2344274C1 |
SEPARATE MAINTENANCE PROCESS FOR INJECTION OR PRODUCTION WELL AND IMPLEMENTATION VARIANTS | 2006 |
|
RU2328590C1 |
PUMPING BLOCK FOR WELL OPERATION (VARIANTS) | 2004 |
|
RU2300668C2 |
METHOD OF EXTRACTING FLUID FROM RESERVOIR OF ONE WELL WITH ELECTRIC DRIVE PUMP EQUIPPED WITH ELECTRIC VALVE AND INSTALLATION FOR IMPLEMENTATION OF THIS METHOD | 2008 |
|
RU2385409C2 |
METHOD OF INVESTIGATION OF LEAKTIGHTNESS OR LEAKINESS OF PACKER SYSTEM AND CEMENT BRIDGE OF WELL | 2011 |
|
RU2475641C1 |
PACKER SEPARATION DEVICE FOR WELL RESERVOIR OPERATION (VARIANTS) | 2004 |
|
RU2305170C2 |
Authors
Dates
2007-12-27—Published
2006-03-27—Filed