FIELD: mining industry.
SUBSTANCE: at least one pipes column is lowered into well with constant or variable diameter with or without plugged end, with at least one packer lowered below upper bed of hydraulic and/or mechanical effect with or without column separator. Below and above packer mounting assemblies are lowered in form of well chamber, or nipples with removable valve for feeding working agent through them respectively into lower and upper beds, mounting packer and pressing it from downwards and/or upwards. Minimal absorption pressure for each bed is determined during pressing. Working agent is pumped from mouth into pipes column hollow at given pressure, directing it into upper and/or lower beds through appropriate detachable valves in mounting assemblies. Total flow of working agent is measured on the surface as well as mouth pressure and/or temperature in pipes column hollow and behind-pipe well space. Face pressure of upper bed is determined as well as pressure in pipes column and behind-column space at depth of detachable valve in mounting assembly above the packer. Flow of working agent pumped into upper bed through detachable well is determined, subtracted from total flow and flow of working agent fed into lower bed is determined. Actual flows of working agent for beds are compared to planned values. In case of differences mouth pressure is changed ad/or detachable valves for one or more beds are extracted from mounting assemblies by rope gears. Their characteristics and/or parameters are determined and altered. After that each detachable valve is mounted again into appropriate mounting assembly by rope gears and pumping of working agent through them into appropriate beds is resumed.
EFFECT: higher efficiency.
25 cl, 11 dwg
Title | Year | Author | Number |
---|---|---|---|
BOREHOLE PLANT FOR SIMULTANEOUS SEPARATE AND ALTERNATE OPERATION OF SEVERAL FORMATIONS BY SINGLE WELL | 2003 |
|
RU2262586C2 |
METHOD FOR SIMULTANEOUS SEPARATE MULTIPLE-ZONE WELL OPERATION | 2006 |
|
RU2313659C1 |
PACKER SEPARATION DEVICE FOR WELL RESERVOIR OPERATION (VARIANTS) | 2004 |
|
RU2305170C2 |
MULTI-RESERVOIR WELL SUMULTANIOUS-SEPARATE PRODUCTION METHOD | 2008 |
|
RU2380526C1 |
PUMPING BLOCK FOR WELL OPERATION (VARIANTS) | 2004 |
|
RU2300668C2 |
SEPARATE MAINTENANCE PROCESS FOR INJECTION OR PRODUCTION WELL AND IMPLEMENTATION VARIANTS | 2006 |
|
RU2328590C1 |
DEVICE FOR CUTTING OFF AND CONTROLLING FLOW IN A WELL WITH ONE OR SEVERAL FORMATIONS | 2005 |
|
RU2291949C2 |
SHARIFOV'S MANDREL INSTRUMENT TO MEASURE WELL PARAMETERS | 2009 |
|
RU2387825C1 |
METHOD OF SIMULTANEOUSLY-DIVIDED SURVEY AND DEVELOPMENT OF MULTIPAY FIELD (VERSIONS) | 2008 |
|
RU2371576C1 |
SHARIFOV'S PACKER SYSTEM FOR ISOLATION OF NON-WORK PERFORATION RANGE OR UNTIGHT HOLE SECTION | 2009 |
|
RU2387802C1 |
Authors
Dates
2005-05-27—Published
2003-09-11—Filed