FIELD: construction, particularly gas-turbine plant and gas-pumping facility erection.
SUBSTANCE: assemblage method involves lowering upper structure on lower one; bringing in register orifices of jointing flange connected to upper structure with guiding orifices of that of lower structure; connecting the first tether ends to at least two orifices of jointing flange; passing the second tether ends through corresponding orifices of jointing flange connected to lower structure; tightening tether during upper structure lowering onto lower one.
EFFECT: decreased labor inputs and increased operational safety.
1 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
INSTALLATION METHOD OF LONG STRUCTURES | 2007 |
|
RU2350548C1 |
INSTALLATION METHOD OF LONG STRUCTURES | 2007 |
|
RU2350549C1 |
DEVICE FOR CONNECTING STRUCTURAL SECTIONS | 0 |
|
SU1726686A1 |
DEVICE FOR CONNECTING METAL STRUCTURE SECTIONS | 0 |
|
SU1740579A1 |
JOINT OF BUILDING MEMBERS | 0 |
|
SU1775537A1 |
METHOD FOR CONSTRUCTION OF MULTISTORE BUILDINGS OF THREE-DIMENSIONAL BLOCKS | 2016 |
|
RU2616306C1 |
METHOD OF ERECTION OF CYLINDRICAL SPACE COMPLEX (VERSIONS) | 1998 |
|
RU2130877C1 |
GUIDE BEAM OF POWER SWIVEL OF DRILLING RIG | 2014 |
|
RU2558871C1 |
GAS-TURBINE PLANT NOISE-ABSORBING SHELL | 2005 |
|
RU2296235C1 |
OFFSHORE ICE-RESISTANT PLATFORM | 2022 |
|
RU2781491C1 |
Authors
Dates
2008-02-20—Published
2006-05-02—Filed