FIELD: oil production, particularly use of chemicals or bacterial activity for oil production stimulation.
SUBSTANCE: method involves injecting water-repellent agent in organic solvent in well; injecting displacement water, namely dry oil; performing technological time-delay; producing oil from producing well. Before water-repellent agent injection in well waste compressor oil is additionally injected in well. Said time-delay is carried out for at least 96 hours. The water-repellent agent is ethylene-vinyl-acetate copolymer added to solvent in amount of 0.05-2.0%. Ratio between ethylene-vinyl-acetate copolymer and waste compressor oil is 1:(1-5). Said oil is additionally injected after said solution injection with ratio of 1:(1-5):1 correspondingly.
EFFECT: increased efficiency of reservoir treatment.
2 cl, 1 tbl
Title | Year | Author | Number |
---|---|---|---|
WATERPROOFING FORMULATION FOR TREATING BOTTOMHOLE FORMATION ZONE | 2006 |
|
RU2317312C1 |
OIL EXTRACTION METHOD | 2003 |
|
RU2247231C2 |
OIL EXTRACTION METHODS | 2003 |
|
RU2247235C2 |
COMPOSITION FOR TREATMENT OF BOTTOMHOLE FORMATION ZONE | 2006 |
|
RU2318857C1 |
PROCESS INTENSIFYING OIL EXTRACTION | 2001 |
|
RU2199655C1 |
FORMULATION FOR TREATING CRITICAL AREA OF CARBONATE RESERVOIR AND A METHOD OF ACID TREATMENT OF CRITICAL AREA OF FORMATION | 2005 |
|
RU2293101C1 |
METHOD OF TREATING BOTTOM ZONE OF WATERED FORMATION | 2002 |
|
RU2242596C2 |
HYDROPHOBIC AGENT FOR TREATMENT OF BOTTOM ZONE OF FORMATION, HYDROPHOBIC REAGENT BASED THEREON, AND A METHOD FOR PREPARING HYDROPHOBIC REAGENT | 2003 |
|
RU2237803C1 |
METHOD FOR INSULATION OF GAS INFLOWS IN PRODUCTION WELLS | 2018 |
|
RU2698924C1 |
HYDROPHOBIC AGENT FOR TREATMENT ON BOTTOM AREA OF FORMATION | 2003 |
|
RU2244818C2 |
Authors
Dates
2008-03-10—Published
2006-12-25—Filed