HORIZONTAL WELL OPERATION METHOD Russian patent published in 2015 - IPC E21B43/00 E21B43/32 

Abstract RU 2558090 C1

FIELD: oil and gas industry.

SUBSTANCE: invention relates to the oil industry and may be used in the operation of a horizontal well. According to the method well operation is performed. A pipe string is run down to the horizontal well. An insulating material is injected through the pipe string to a water-inflow interval of the productive formation. Oil is extracted until the horizontal well is flooded. Under the main borehole along the boundary of the oil-water contact an additional borehole is drilled from the horizontal well per 50 m longer than the old hole. The coil tubing is run down to the well complete from below with a hydraulic whipstock and a screen, which openings are covered hermetically by a hollow bushing. The process fluid is injected to the coil tubing thus creating an excess pressure. Simultaneously the coil tubing is moved down until it gets to the additional borehole. The coil tubing is run down up to the bottomhole of the additional hole. At the wellhead a top cementing plug is set into the coil tubing. An excess pressure is created in the coil tubing above the top cementing plug and the hollow bushing is moved thus opening the screen openings. Microcement grout is injected through the coil tubing and flushed to the additional hole and the bottomhole zone. Simultaneously the coil tubing is pulled out for the purpose of additional hole filling with the microcement grout. Flushing of the microcement grout is stopped when pressure increases in the coil tubing up to a permissible value. The coil tubing is pulled out from the well and the process is withheld for cement setting and hardening. The additional hole is cut off from the old hole by setting a bridge plug in a kickoff interval at the inlet to the offshoot. A pump is run down at the process pipe string to the old hole of the horizontal well and operation of the horizontal well is started. At water encroachment into the produced product the process pipe string with the pump is pulled out from the well, a geophysical study is performed and a water-producing interval is indentified in the horizontal well. The water-producing interval in the old hole of the horizontal well is isolated.

EFFECT: increased efficiency of the method due to the complete exhaustion of oil reserves from the productive formation notwithstanding the drawdown value.

4 dwg

Similar patents RU2558090C1

Title Year Author Number
METHOD TO ISOLATE CONE OF BOTTOM WATER IN GAS PRODUCING WELL 2020
  • Leontev Dmitrii Sergeevich
  • Tsilibin Vladislav Vitalevich
  • Bakirova Adelia Daniiarovna
RU2726668C1
METHOD FOR PREVENTION OF BOTTOM WATER INFLUX TO PRODUCING OIL WELL 2016
  • Leontev Dmitrij Sergeevich
  • Kleshchenko Ivan Ivanovich
  • Dolgushin Vladimir Alekseevich
  • Yagafarov Alik Kayumovich
  • Ankudinov Aleksandr Anatolevich
  • Popova Zhanna Sergeevna
  • Zhaparova Darya Vladimirovna
  • Ponomarev Andrej Aleksandrovich
RU2620684C1
METHOD FOR ISOLATION OF WATER FLOW IN OPEN HORIZONTAL SECTION PRODUCING WELLS 2015
  • Evdokimov Aleksandr Mikhajlovich
  • Nizaev Ramil Khabutdinovich
  • Novikov Igor Mikhajlovich
  • Bakirov Ilshat Mukhametovich
  • Kadyrov Ramzis Rakhimovich
  • Khasanova Dilbarkhon Kelamedinovna
RU2597220C1
DEVICE TO DETERMINE WATER PRODUCTION INTERVALS AND TO ISOLATE THEM IN BOREHOLES OF MULTIHOLE HORIZONTAL WELLS 2012
  • Makhmutov Il'Gizar Khasimovich
  • Zijatdinov Radik Zjauzjatovich
  • Sulejmanov Rinat Gabdrakhmanovich
  • Andreev Vladimir Aleksandrovich
RU2514009C1
WATER FLOW ISOLATION TECHNIQUE IN UNCASED HORIZONTAL BOREHOLE SECTION OF PRODUCING WELL 2014
  • Makhmutov Il'Gizar Khasimovich
  • Kadyrov Ramzis Rakhimovich
  • Zijatdinov Radik Zjauzjatovich
  • Nizaev Ramil' Khabutdinovich
  • Khasanova Dil'Barkhon Kelamedinovna
RU2560018C1
METHOD OF INTENSIFICATION OF WELL OPERATION AFTER ITS CONSTRUCTION 2019
  • Ismagilov Fanzat Zavdatovich
  • Lutfullin Azat Abuzarovich
  • Khusainov Ruslan Fargatovich
RU2724705C1
METHOD OF DEVELOPMENT OF FLOODED OIL DEPOSIT 2012
  • Makhmutov Il'Gizar Khasimovich
  • Kadyrov Ramzis Rakhimovich
  • Zijatdinov Radik Zjauzjatovich
  • Zhirkeev Aleksandr Sergeevich
  • Sulejmanov Farid Bashirovich
RU2504650C1
METHOD OF BOTTOM WATER CONE CUTTING 2016
  • Leontev Dmitrij Sergeevich
  • Kleshchenko Ivan Ivanovich
  • Yagafarov Alik Kayumovich
  • Dolgushin Vladimir Alekseevich
  • Vodorezov Dmitrij Dmitrievich
  • Zemlyanoj Aleksandr Andreevich
  • Sipina Natalya Alekseevna
  • Zhaparova Darya Vladimirovna
RU2655490C2
METHOD OF HYDRAULIC FRACTURING OF WELL FORMATION 2011
  • Makhmutov Il'Gizar Khasimovich
  • Zijatdinov Radik Zjauzjatovich
  • Salimov Oleg Vjacheslavovich
  • Salimov Vjacheslav Gajnanovich
  • Zhirkeev Aleksandr Sergeevich
RU2483209C1
METHOD OF DRILLING AND DEVELOPMENT OF OFFSHOOT FROM HORIZONTAL WELL (VERSIONS) 2019
  • Makhmutov Ilgizar Khasimovich
  • Ziyatdinov Radik Zyauzyatovich
RU2709262C1

RU 2 558 090 C1

Authors

Fatkullin Rashad Khasanovich

Makhmutov Il'Gizar Khasimovich

Bikbulatov Renat Rafaehl'Evich

Kadyrov Ramzis Rakhimovich

Zijatdinov Radik Zjauzjatovich

Dates

2015-07-27Published

2014-07-01Filed