FIELD: oil and gas industry.
SUBSTANCE: in method for well completion including pumping of acid solution into open horizontal hole in the mode of jet impact such impact is attained due to a jet delivery by a jet nozzle at the end of a flexible flush-joint pipe. The nozzle is placed at the borehole bottom. The acid solution is pumped with circulation through the well mouth; while acid solution is circulating the flexible flush-joint pipe is lifted simultaneously from the well with the speed not exceeding speed of the borehole filling by the acid solution. When horizontal hole is filled with the acid solution, the solution is overflushed into the stratum with staged pressure build-up and exposure at each stage. The flexible flush-joint pipe with a nozzle is placed again at the borehole bottom and the operation of borehole filling and overflushing is repeated again. Soaking takes place so that acid solution could react with the rock. The flexible flush-joint pipe is lifted to the interval of inert gas pumping, an inert gas is pumped and a build-up curve is recorded. Cyclic well killing is carried out in the mode of water pumping - soaking - oil draining till complete oil drain; thereafter a submerged pump is run-in and the well is input into operation.
EFFECT: improvement in efficiency of the well treatment by an acid due to uniform treatment of all intervals of the horizontal borehole in dynamic mode with oil film washing-off from walls of the open hole and increase of acidized zone.
1 ex
Title | Year | Author | Number |
---|---|---|---|
WELL COMPLETION METHOD | 2014 |
|
RU2541988C1 |
WELL COMPLETION METHOD, EXPOSING PRODUCTIVE FORMATION LOCATED NEAR WATER-SATURATED FORMATION | 2015 |
|
RU2579069C1 |
WELL COMPLETION METHOD, EXPOSING PRODUCTIVE FORMATION, LOCATED IN ISOLATION FROM WATER-BEARING FORMATION | 2015 |
|
RU2593281C1 |
WELL COMPLETION METHOD | 2014 |
|
RU2541986C1 |
HORIZONTAL WELL COMPLETION METHOD | 2015 |
|
RU2588108C1 |
WELL BOTTOMHOLE ZONE TREATMENT METHOD | 2015 |
|
RU2601960C1 |
PROCESSING METHOD OF CARBONATE OIL RESERVOIR | 2016 |
|
RU2614840C1 |
METHOD ACID TREATMENT FOR RESERVOIRS WITH WATER-OIL CONTACT | 2016 |
|
RU2642900C1 |
METHOD FOR DEVELOPMENT OF MULTI-HOLE BRANCHED HORIZONTAL WELL | 2014 |
|
RU2581589C1 |
ACID TREATMENT METHOD OF OPEN HORIZONTAL SHAFT OF WELLS | 2020 |
|
RU2740505C1 |
Authors
Dates
2013-08-20—Published
2012-10-04—Filed