FIELD: seismic research, possible application in oil industry, namely, during control of process of hydro-disruption of a hydrocarbon deposit formation.
SUBSTANCE: in accordance to the method, simultaneous synchronous recording of seismic oscillations at day surface above the face of well in which hydro-disruption of formation take place, is performed. For recording, seismic antenna and digital recording equipment are used. Recording is realized at day surface before conduction of hydro-disruption, in process of it and after hydro-disruption with time alignment with technological processes involved in conduction of hydro-disruption. Processing of seismic signals in real time is performed at every discrete time moment. On basis of results of seismic signal processing, size and direction of development of fissuring surfaces are determined, ensuring control of process of hydro-disruption of a formation.
EFFECT: optimized conduction of hydro-disruption of a formation.
3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR CONTROLLING DEVELOPMENT OF HYDROCARBON FORMATIONS ON BASIS OF MICRO-SEISMIC EMISSION | 2006 |
|
RU2309434C1 |
METHOD FOR SEISMIC MONITORING OF HYDRAULIC FRACTURING PROCESSES IN DEVELOPMENT OF HYDROCARBON DEPOSITS AND HEAT IMPACT PROCESSES IN DEVELOPMENT OF HIGH-VISCOSITY HYDROCARBONS | 2020 |
|
RU2758263C1 |
CONTROL MICROSEISMIC COMPLEX OF HYDROCARBONS CONTINENTAL AND OFFSHORE FIELDS DEVELOPMENT, BASED ON THE AREA RECORDING SYSTEMS AND SUPER COMPUTER METHODS OF INFORMATION PROCESSING | 2013 |
|
RU2618485C2 |
METHOD OF SEISMIC MONITORING OF DEVELOPMENT OF ULTRA-VISCOUS OIL DEPOSITS | 2017 |
|
RU2708536C2 |
METHOD TO DETERMINE GEOMETRIC CHARACTERISTICS OF HYDRAULIC FRACTURING CRACK | 2014 |
|
RU2550770C1 |
HARDWARE-SOFTWARE SYSTEM FOR MICROSEISMIC MONITORING OF OIL AND GAS FIELDS DEVELOPMENT | 2022 |
|
RU2799398C1 |
METHOD OF DEVELOPMENT OF MINERAL DEPOSITS EXTRACTED THROUGH WELLS | 2007 |
|
RU2357073C2 |
OIL DEPOSIT DEVELOPMENT METHOD | 2012 |
|
RU2526922C2 |
METHOD OF DIAGNOSING DANGEROUS SITUATIONS IN DEEP MINING AND FORECASTING PARAMETERS OF FISSURING ZONES FORMED BY FRACTURING | 2011 |
|
RU2467171C1 |
METHOD FOR EXTRACTION OF OIL DEPOSIT | 2005 |
|
RU2291955C1 |
Authors
Dates
2008-03-10—Published
2006-06-19—Filed