FIELD: reclamation system construction, particularly to create collection-drain systems in water-saturated ground.
SUBSTANCE: method involves preparing path in ground strip; digging-out trench; delivering and laying drain pipeline pipes in trench; filling the trench with volumetric filtering material and backfilling the trench with mineral soil. Volumetric filtering material is automatically screen-sized during filtering material supply before pipe filling directly inside pipelayer bunker so that material particle dimensions increase from trench bottom towards back-filler layer. Drain pipeline pipe is located in center of trench so that drain pipeline pipe orifices face upwards relatively trench bottom. Device for said method realization comprises earth-shifting working tool of drainage machine, pipelayer bunker with screen system and guiding gravity conveyer pipe. Screen system is connected to the guiding gravity conveyer pipe inside pipelayer bunker so that the screens are inclined through 45° to horizon line. The screen concavities face rear wall. Screen system is fastened to front wall of pipelayer bunker and gravity conveyer pipe.
EFFECT: increased quality of drain pipeline laying and operational efficiency thereof.
3 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR CONSTRUCTION OF DRAIN IN WATER-BEARING GROUND | 0 |
|
SU1772316A1 |
METHOD FOR CONSTRUCTION OF A BLIND HORIZONTAL DRAINAGE | 0 |
|
SU1824481A1 |
METHOD FOR CONSTRUCTION OF DRAINAGE SYSTEM IN WATER-LOGGED SOILS | 1992 |
|
RU2017893C1 |
DRAINLAYER HOPPER | 2000 |
|
RU2188280C2 |
METHOD OF CHEMICAL PROTECTION OF CLOSED HORIZONTAL DRAINAGE OF IRRIGATED LANDS | 1991 |
|
RU2076917C1 |
NARROW-TRENCH METHOD OF HORIZONTAL DRAIN CONSTRUCTION AND DEVICE FOR ITS REALISATION | 2009 |
|
RU2422586C1 |
METHOD OF CONSTRUCTING LEADER DRAIN | 0 |
|
SU1812268A1 |
METHOD OF BUILDING PLASTIC DRAINAGE IN WATER-LOGGED GROUND | 2003 |
|
RU2232844C1 |
METHOD OF BUILDING DRAINAGE IN WATER-SATURATED GROUND | 0 |
|
SU1569379A1 |
METHOD FOR CLOSED DRAINAGE CONSTRUCTION AND DEVICE FOR ITS ACCOMPLISHMENT | 0 |
|
SU1714054A1 |
Authors
Dates
2008-03-27—Published
2005-03-21—Filed