FIELD: construction, particularly railings, hand-rails and banisters for staircases, balconies and so on.
SUBSTANCE: baluster production method involves producing vertical post with end parts and central parts; connecting central parts and end parts one to another. End parts are created by baluster modules. Central part is defined by baluster module connection device. Each baluster module comprises bottle-like vessel with wall, bottom and neck. The bottles are arranged so that bottle necks face each other. Baluster module connection device is arranged between necks and partially enters the necks. Baluster module production method involves producing vertical post including bottle-like vessel having wall, bottom and heck.
EFFECT: increased efficiency of baluster and baluster module production.
2 cl, 1 dwg
Authors
Dates
2008-03-27—Published
2006-09-04—Filed