FIELD: oil and gas production, particularly killing of gas and gas-condensate packing well having packer, circulation valve and another downhole equipment included in production tubing before well overhaul, particularly for well exposing productive reservoir with low reservoir properties.
SUBSTANCE: method involves lowering flexible pipe in well to lower perforation orifices; injecting blocking solution via flexible pipe to well bottom within perforation interval; lifting flexible pipe over perforation interval and filling annular space between flexible pipe and production string with killing liquid via flexible pipe; simultaneously discharging gas from annular space into environment through flare line; removing flexible pipe from well; opening circulation valve, for instance with the use of cable equipment; filling hole annuity of well over packer via circulation valve along with bleeding gas from hole annuity over packer into environment through flare line; performing technological time-delay; discharging gas caps from well tube and annular spaces accumulated during time-delay operation; equalizing killing liquid in tube and annular spaces of the well by opening liquid circulation through opened circulation valve.
EFFECT: possibility to retain reservoir properties of low-permeable reservoir without gas and gas condensate-packing well killing reliability decrease in abnormally low reservoir pressure.
Title | Year | Author | Number |
---|---|---|---|
PACKING WELL KILLING IN THE CASE OF ABNORMALLY LOW RESERVOIR PRESSURE | 2006 |
|
RU2323328C1 |
METHOD FOR PACKER GAS WELL KILLING | 2006 |
|
RU2319827C1 |
WELL KILLING LIQUID | 2006 |
|
RU2319828C1 |
METHODS OF WELL KILLING WITHIN THE SEVERE ENVIRONMENT OF GAS AND GAS-CONDENSATE WELLS | 2010 |
|
RU2441975C1 |
METHOD FOR HYDRAULIC FRACTURING OF RESERVOIR IN GAS WELL | 2005 |
|
RU2301885C1 |
METHOD OF HYDROLIC FRACTURING OF FORMATION OF CONDENSATE BOREHOLE | 2006 |
|
RU2324050C2 |
METHOD OF GAS WELL CONTROL | 2006 |
|
RU2347066C2 |
PROCEDURE FOR COMPLETION OF GAS WELL (VERSIONS) | 2010 |
|
RU2438007C1 |
PROCESS OF WELL COMPLETION | 2002 |
|
RU2220280C1 |
METHOD FOR GAS WELL SUSPENSION | 2010 |
|
RU2442877C1 |
Authors
Dates
2008-04-20—Published
2006-07-04—Filed