FIELD: oil and gas producing industry.
SUBSTANCE: method includes killing of well, mouth remanifolding, removal of production tubing from borehole and lowering into borehole flow column with high pressure packer, following mouth remanifolding, pack sealing, performing hydraulic fracturing of formation with fixing faults by proppant, then mouth remanifolding, tearing off high pressure packer, lowering flow column into borehole, mouth remanifolding and well completion. According to invention, after killing of well, during mouth remanifolding, preventer is installed. In hydraulic fracturing of formation, sealing solution and well killing fluid of necessary density is pumped into production pipes and annula space via circular valve. After that, at least 2 cycles of fluid circulation is performed.
EFFECT: reliability and safety of process is increased while assembling cost is reduced.
3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR HYDRAULIC FRACTURING OF RESERVOIR IN GAS WELL | 2005 |
|
RU2301885C1 |
METHOD FOR HYDRAULIC RESERVOIR FRACTURING INSIDE GAS WELL | 2005 |
|
RU2306412C1 |
METHOD FOR UPGRADING GAS-CONDENSATE WELL | 2016 |
|
RU2651716C1 |
METHOD OF EMERGENCY KILLING OF FLOWING GAS WELL IN PRESENCE OF PERMAFROST ROCKS | 2015 |
|
RU2591866C1 |
MULTI-BOTTOMHOLE DESIGN FOR PRODUCTION IN PERMAFROST AREAS | 2008 |
|
RU2379496C1 |
RECOVERY OF SELF-SQUEEZING GAS WELL WITH ABNORMALLY LOW SEAM PRESSURE | 2013 |
|
RU2539060C1 |
MULTI-BOTTOMHOLE DESIGN FOR PRODUCTION IN PERMAFROST | 2008 |
|
RU2379487C1 |
METHOD OF DEEP GAS WELL EQUIPMENT WITH TUBING STRING COMPOSITION | 2016 |
|
RU2614998C1 |
WELL COMPLETION METHOD AFTER WORKOVER | 2022 |
|
RU2801197C1 |
METHOD FOR GAS WELL SUSPENSION | 2010 |
|
RU2442877C1 |
Authors
Dates
2008-05-10—Published
2006-06-26—Filed