FIELD: oil production, particularly obtaining oil from a multiple-zone well with simultaneous separate working agent injection in reservoirs via injection wells.
SUBSTANCE: method involves lowering two pipe strings in production string of well so that packer is lowered below upper reservoir; seating packer and pressure-testing thereof; determining difference between total working agent flow-rate to be injected via injection wells and total rate of liquid produced through producing wells; injecting working agent in lower reservoir in amount equal to said difference; injecting remainder working agent volume in upper low-permeable reservoir; determining maximal injection pressure and working agent flow-rate, which provide working agent taking by reservoir without time-decrease of injected volume, for upper reservoir and injecting working agent with said pressure and flow-rate along with regulation of working agent flow rate in upper reservoir by choke restriction.
EFFECT: increased flooding efficiency for reservoirs having different characteristics.
1 ex
Title | Year | Author | Number |
---|---|---|---|
WELL STRUCTURE AND METHOD OF MULTIPAY OIL POOL DEVELOPMENT | 2007 |
|
RU2344272C2 |
METHOD FOR MULTIZONE OIL RESERVOIR DEVELOPMENT | 2006 |
|
RU2314414C1 |
MULTILAYER OIL DEPOSIT DEVELOPMENT METHOD | 2013 |
|
RU2528305C1 |
METHOD FOR DEVELOPMENT OF MULTIPLE-BED OIL POOL | 1996 |
|
RU2084620C1 |
PROCEDURE FOR DEVELOPMENT OF OIL DEPOSIT | 2010 |
|
RU2417306C1 |
RECOVERY METHOD OF MULTIPLE ZONE OIL DEPOSITS WITH HYDRODYNAMICALLY RELATED RESERVOIRS | 2016 |
|
RU2626491C1 |
METHOD FOR CONCURRENT-SEPARATE OPERATION OF SEVERAL BEDS VIA ONE FORCE WELL IN TURNS | 2003 |
|
RU2253009C1 |
METHOD FOR EXTRACTION OF OIL DEPOSIT WITH NON-HOMOGENOUS COLLECTOR | 2004 |
|
RU2256070C1 |
METHOD OF OIL POOL DEVELOPMENT | 2008 |
|
RU2344277C1 |
MULTILAYER OIL DEPOSIT DEVELOPMENT METHOD | 2014 |
|
RU2557282C1 |
Authors
Dates
2008-04-27—Published
2007-05-03—Filed