FIELD: oil and gas industry.
SUBSTANCE: method involves opening of strata by injectors and producers, injection of working fluid and recovery of the product. The section is selected where at least 20 thousand t of remaining reserves are available for each producer, an injector is selected with three perforated strata, to the lower stratum with the biggest permeability injection of working fluid is limited up to minimum values of 40 m3/day as the most, unlimited, as maximum as possible injection of the working fluid is done to other strata. The injector is operated in this mode, status of producers in the second stratum is analysed; when bottomhole pressure increases per 10-15% and water cut increases per 40% in the nearest producer of the second stratum, intensification of the operation mode is made for the producer. When bottomhole pressure increases per 10-15% and water cut increases per 40% in the nearest producer of the second stratum complete or partial limitation of injection is done for the second stratum. Control is carried out over bottomhole pressure in the area of complete or partial limitation of injection for the lowest and the most permeable stratum, and when decrease in bottomehole pressure per 10-15% below saturation pressure is confirmed injection volumes are increased in order to prevent decrease in oil recovery volume. Limitation of injection to the most permeable stratum and status analysis of the producers in the second stratum are repeated periodically.
EFFECT: improving oil recovery of the deposit.
2 ex
Title | Year | Author | Number |
---|---|---|---|
MULTILAYER OIL DEPOSIT DEVELOPMENT METHOD | 2014 |
|
RU2557282C1 |
METHOD OF DEVELOPMENT OF STRATIFIED OIL DEPOSIT WITH HIGH-VISCOSITY OIL | 2014 |
|
RU2563463C1 |
METHOD FOR MULTIPAY FIELD SURVEY AND DEVELOPMENT | 2005 |
|
RU2315863C2 |
MULTILAYER OIL DEPOSIT DEVELOPMENT METHOD | 2014 |
|
RU2558546C1 |
DEVELOPMENT METHOD OF HIGH-VISCOSITY OIL DEPOSIT WITH USE OF IN-SITU COMBUSTION | 2010 |
|
RU2429346C1 |
METHOD FOR DEVELOPMENT OF MULTIPLE-BED OIL DEPOSITS | 1995 |
|
RU2105869C1 |
METHOD FOR CONCURRENT-SEPARATE OPERATION OF SEVERAL BEDS VIA ONE FORCE WELL IN TURNS | 2003 |
|
RU2253009C1 |
METHOD OF DEVELOPMENT OF OIL MULTILAYER DEPOSIT | 2019 |
|
RU2726664C1 |
METHOD FOR DEVELOPMENT OF OIL DEPOSIT | 1995 |
|
RU2085714C1 |
BOREHOLE PLANT FOR SIMULTANEOUS SEPARATE AND ALTERNATE OPERATION OF SEVERAL FORMATIONS BY SINGLE WELL | 2003 |
|
RU2262586C2 |
Authors
Dates
2014-09-10—Published
2013-11-07—Filed