FIELD: oil-and-gas industry.
SUBSTANCE: design includes main and lateral bottomholes. A production string equipped in a under permafrost area with a wellhead shut off valve, in a interval over the top lateral bottomhole - production string thermal expansion bend, a flow valve, a string separator, a production parker, a landing nipple, a bowl guide. In a interval opposite to the side boreholes are mini-windows units with installed over it sealing parkers with landing nipples, and under them - snap shut connection. In a interval between the lateral boreholes and under the bottom lateral bottomhole pipes installed, equipped with bottom pipes shoe with polished tips. At that the bow guide located on the lower situated equipment and didn't connect to it. The production string in permafrost area interval can be equipped with thermal insulated pipes, and in interval over the top lateral bottomhole - with inhibitor valve. The production string diametre to be estimated form analytical equation.
EFFECT: multi-bottomhole well design reliability increase.
4 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
MULTI-BOTTOMHOLE DESIGN FOR PRODUCTION IN PERMAFROST | 2008 |
|
RU2379487C1 |
DESIGN OF COASTAL MULTI-HOLE INTELLIGENT GAS WELL FOR DEVELOPMENT OF OFFSHORE DEPOSIT | 2015 |
|
RU2580862C1 |
MARINE MULTIHOLE GAS WELL FOR OPERATION OF OFFSHORE DEPOSITS ARCTIC ZONE WITH SURFACE ARRANGEMENT OF WELLHEAD EQUIPMENT | 2014 |
|
RU2584706C1 |
MULTI BRANCH, LOW PRODUCTION RATE WELL ASSEMBLY FOR SIMULTANIOUSE SEVERAL RESERVOIRS OF DIFFERENT PRODUCTIVITY PRODUCTION, IN ABNORMALLY LOW RESERVOIR PRESSURE CONDITIONS | 2008 |
|
RU2382182C1 |
GAS AND GAS CONDENSATE OPEN HOLE WELL DESIGN | 2008 |
|
RU2378497C1 |
METHOD OF CONSTRUCTING COASTAL MULTI-HOLE GAS WELL FOR DEVELOPMENT OF SHELF DEPOSIT | 2015 |
|
RU2602257C2 |
PROCEDURE FOR COMPLETION OF GAS WELL (VERSIONS) | 2010 |
|
RU2438007C1 |
METHOD OF DEEP GAS WELL EQUIPMENT WITH TUBING STRING COMPOSITION | 2016 |
|
RU2614998C1 |
OFFSHORE WELL FOR OIL AND GAS RECOVERY WITH ABOVE-WATER PLACEMENT OF WELLHEAD EQUIPMENT | 2014 |
|
RU2566162C1 |
METHOD FOR GAS WELL SUSPENSION | 2010 |
|
RU2442877C1 |
Authors
Dates
2010-01-20—Published
2008-07-16—Filed