FIELD: oil producing industry.
SUBSTANCE: invention is referred to oil producing industry, in particular to technology of well site construction and it is intended for well cementing drilled on oil, gas and water. The method for isolation of a pay at the casing cementing includes a running with a saddle on a bottom-hole of a casing string, equipped with the device for pay isolation in the form of the back pressure valves which have been placed at the pay base surface level, landing of oil well tubings with a trailer nipple, an injection in tubular annulus of calculated quantity of a working substance with a gravity equal to the gravity of a cement mortal, landing of oil well tubings prior pressure-tight interplay of a nipple with a saddle, an injection of a cement mortal and its pushing through by chaser in annular room of a casing string, hermetic sealing of internal room of a tubing string, an injection in tubular annulus of calculated quantity of chaser, dissociation of annular room of a hole and its development, as a working substance a cement mortal with hollow members is used, space filled by hardened at chilling by water or by a sandy-oil mixture, after a cement-slurry thickening and withstanding before fusion of specified water or a sandy-oil mixture under the influence of exterior factors the opening and a depression purification are carried out.
EFFECT: reliable isolation of a pay, extension of functionality due to realisation of the specified method at down hole performance with a pay having high injection capacity.
4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF PRODUCTIVE STRATUM ISOLATION DURING CEMENTING CASING PIPE | 2001 |
|
RU2234593C2 |
METHOD OF PRODUCING FORMATION INSULATION DURING CEMENTATION OF CASING PIPE | 2006 |
|
RU2330933C1 |
METHOD OF PRODUCING FORMATION ISOLATION IN CEMENTING OF CASING STRING | 2001 |
|
RU2189431C1 |
METHOD OF WELL TWO-STAGE CEMENTING | 2001 |
|
RU2196880C1 |
METHOD FOR DEVELOPMENT OF HIGH-VISCOSITY OIL RESERVES | 2010 |
|
RU2442883C1 |
METHOD FOR DEVELOPMENT OF HIGH-VISCOSITY OIL DEPOSITS | 2008 |
|
RU2398104C2 |
INSULATION METHOD FOR BEHIND-THE-CASING FLOWS IN PRODUCTION WELL | 2020 |
|
RU2739181C1 |
PROCEDURE FOR DEVELOPMENT OF HIGH VISCOUS OIL DEPOSITS | 2008 |
|
RU2363839C1 |
PROCESS OF TERMINATION OF CONSTRUCTION OF WELLS AND GEAR FOR ITS IMPLEMENTATION | 2000 |
|
RU2165516C1 |
CASING ANNULUS PLUGGING METHOD | 2005 |
|
RU2286438C1 |
Authors
Dates
2008-06-10—Published
2006-11-07—Filed