FIELD: oil and gas industry.
SUBSTANCE: in this method of oil deposit development by thermal and water-gas simulation composed of drilling of producers and injectors at the oil deposit area, injecting of water-gas mixture and heat carrier through injectors, extracting of the product through producers, vertical producers and injectors are drilled as per in-line development method, calculation of optimal injection parameters is made as per thermal hydrodynamic model with use of the above wells drilling data. Ratio of the vertical producers and injectors is 2:1. Horizontal injectors are drilled between lines of vertical producers without vertical injectors. Horizontal shafts are placed in parallel to each other with length of (1.4-2.8)·a, where a is the distance between vertical wells. Horizontal injectors are equipped with bottomhole heaters and injection is made to the formations lying at the depth of 700 m and more with hot water at temperature of at least 95°C at the wellhead and under injection pressure of (0.45-0.85)·Pg, where Pg is vertical ground pressure; to the formations lying at the depth less than 700 m water steam is injected with temperature of at least 200°C at the wellhead and steam dryness factor of 0.6-0.8. To each vertical injector water-gas mixture is injected, at that the mixture consists of water and associated gas, with the consumption rate of Qg=Vg/N+Qw, m3/day, where Vg is volume of produced associated gas from the zone per day, m3; N is a number of vertical injectors; Qw is consumption of water injected to vertical injectors ensuring 100% current compensation of extraction by injection in the zone, m3/day.
EFFECT: higher oil formation recovery, reduced oil viscosity and increased coverage ratio for the formation.
2 ex, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVELOPMENT OF OIL DEPOSIT BY HEAT AND WATER-GAS IMPACTS IN VERTICAL, HORIZONTAL AND MULTIHOLE WELLS SYSTEM | 2013 |
|
RU2524580C1 |
METHOD OF OIL DEPOSIT DEVELOPMENT BY WATER AND GAS INJECTION | 2013 |
|
RU2527432C1 |
DEVELOPMENT METHOD OF OIL DEPOSIT LOCATED ABOVE GAS DEPOSIT AND SEPARATED WITH NON-PERMEABLE INTERLAYER FROM IT | 2011 |
|
RU2502861C2 |
OIL DEPOSIT DEVELOPMENT METHOD | 2011 |
|
RU2469183C2 |
DEVELOPMENT METHOD OF POWERFUL MULTI-ZONE LOW-PERMEABILITY OIL DEPOSIT | 2020 |
|
RU2732744C1 |
OIL RECOVERY METHOD | 2007 |
|
RU2326234C1 |
DEVELOPMENT METHOD OF OIL DEPOSIT LOCATED ABOVE GAS DEPOSIT AND SEPARATED FROM IT WITH NON-PERMEABLE INTERLAYER | 2011 |
|
RU2478164C1 |
METHOD OF DEVELOPMENT OF OIL POOL LOCATED ABOVE GAS POOL AND SEPARATED THEREFROM BY IMPERMEABLE PARTING | 2012 |
|
RU2499134C2 |
METHOD OF DEVELOPMENT OF MULTIPAY OBJECT WITH HIGH-VISCOSITY OIL | 2015 |
|
RU2584703C1 |
METHOD FOR COMPLEX PROCESSING OF OIL DEPOSIT WITH GAS CAP | 2005 |
|
RU2288354C2 |
Authors
Dates
2014-11-27—Published
2013-10-04—Filed