FIELD: oil-and-gas industry.
SUBSTANCE: proposed method comprises drilling or selection of drilled production and injection wells at oil deposit section. Lateral horizontal shafts or horizontal injection wells are drilled. Water-gas mix consisting of water and associated oil gas is injected via vertical injection wells, hot water is injected via horizontal injection wells or via lateral horizontal shafts and extraction of products via production wells. In compliance with this invention, vertical wells drilling data are used for calculation of optimum injection parameters using the thermal hydrodynamic model. Said horizontal injection wells or lateral horizontal shafts are drilled parallel with multi-face wells or horizontal production wells with spacing between shafts making at least 150 m. Said horizontal injection wells or lateral horizontal shafts are equipped downhole heaters to force hot water with temperature 95°C at well mouth and at injection pressure of (0.45-0.85) Pr, where Pr is vertical rock pressure. In every vertical injection well, injected is water-gas mix at flow rate of Qg=Vg/N+Qw, m3/day, where Vg is the volume of extracted associated oil gas per day, m3; N is the number of vertical injection wells; Qw is flow rate of water injected in vertical injection wells for 100% compensation for extraction for injection, m3/day.
EFFECT: higher reservoir recovery, lower oil viscosity.
2 cl, 2 ex, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF OIL DEPOSIT DEVELOPMENT BY THERMAL AND WATER-GAS SIMULATION | 2013 |
|
RU2534306C1 |
METHOD OF OIL DEPOSIT DEVELOPMENT BY WATER AND GAS INJECTION | 2013 |
|
RU2527432C1 |
DEVELOPMENT METHOD OF OIL DEPOSIT LOCATED ABOVE GAS DEPOSIT AND SEPARATED WITH NON-PERMEABLE INTERLAYER FROM IT | 2011 |
|
RU2502861C2 |
OIL RECOVERY METHOD | 2007 |
|
RU2326234C1 |
OIL DEPOSIT DEVELOPMENT METHOD | 2011 |
|
RU2469183C2 |
DEVELOPMENT METHOD FOR OIL FIELD HAVING BOTTOM WATER | 2006 |
|
RU2307239C1 |
DEVELOPMENT METHOD OF POWERFUL MULTI-ZONE LOW-PERMEABILITY OIL DEPOSIT | 2020 |
|
RU2732744C1 |
METHOD FOR DEVELOPMENT OF OIL AND GAS DEPOSIT AND OIL FRINGE | 1994 |
|
RU2085712C1 |
METHOD OF DEVELOPMENT OF MULTIPAY OBJECT WITH HIGH-VISCOSITY OIL | 2015 |
|
RU2584703C1 |
DEVELOPMENT PROCESS OF PETROLEUM DEPOSIT | 2007 |
|
RU2326235C1 |
Authors
Dates
2014-07-27—Published
2013-10-31—Filed