FIELD: construction.
SUBSTANCE: bracing of boards of a foundation ditch includes protecting and load-carrying wall structure connected with a fastening belt, executed on the top of protecting and a load-carrying structure. The fastening belt is executed in the form of the salient aside reinforced flange from a foundation ditch, located in an dimple of the fore shaft with possibility of rigid connection of a prefabricated reinforcement cage of a flange with the top exposed part of a prefabricated reinforcement cage of a wall structure and joints concreting this connection for increase in flexural rigidness.
EFFECT: increase in flexural rigidness of an upper part of bracing in a vertical plane for a full exception of horizontal moving of a load-carrying wall and a ground towards a foundation ditch.
4 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO REINFORCE FOUNDATION PIT BOARDS | 2010 |
|
RU2417284C1 |
PREFABRICATED REINFORCED CONCRETE FORE SHAFT OF MULTIPLE APPLICATION | 2017 |
|
RU2639766C1 |
DIAPHRAGM WALL | 2005 |
|
RU2288324C1 |
METHOD FOR INCREASING LONGITUDINAL RIGIDITY OF UNDERGROUND STRUCTURE MADE OF PREFABRICATED COMPONENTS | 1997 |
|
RU2148716C1 |
DIAPHRAGM WALL | 2005 |
|
RU2288323C1 |
UNDERGROUND STRUCTURE CONSTRUCTED IN FOUNDATION PIT AND METHOD OF CONCRETING | 1997 |
|
RU2131496C1 |
LINE FOR MANUFACTURING OF ENLARGED WALL ELEMENTS AND WALL HEAT-SAVING FENCING OF BUILDINGS PRODUCED ON THIS LINE | 2008 |
|
RU2398677C2 |
METHOD FOR ERECTION OF BORED PILES PACKET | 2007 |
|
RU2351710C1 |
MULTI-PURPOSE BUILDING | 2007 |
|
RU2345200C2 |
INITIAL STRUCTURE FOR THOROUGHFARE TUNNEL BUILDING | 2002 |
|
RU2227193C1 |
Authors
Dates
2008-06-20—Published
2006-06-29—Filed