FIELD: construction; applicable in construction by open method of underground structure of various purposes. SUBSTANCE: underground structure constructed in foundation pit includes construction of foundation plate and walls having space metal reinforced blocks which consist of steel sheet with ribs and space reinforcing cages. Metal members of temporary support of foundation pit are included in work of permanent structure of walls. Foundation plate is also reinforced with space metal reinforced blocks interconnected by welds with filling of space between steel sheet and foundation pit support and between steel sheet and concrete bottom of foundation pit with cast concrete mix. Method of concreting foundation plate includes concreting at the first stage of lower part of plate section height to form balance weight and at the second stage, concreting the remaining part, after concrete setting of lower part. Technical result of the invention consists in provision of possibility of reduction of foundation pit sizes up to sizes of erected structure, possibility of suspension of engineering services for period of construction without their removal from construction zone, reduction of labor input and terms of construction and reliable waterproofing of underground structure. EFFECT: higher efficiency. 1 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR BLOCK-MODULAR CONSTRUCTION OF STRUCTURES IN FOUNDATION PITS AND BURIED STRUCTURE FOR MILITARY INFRASTRUCTURE FACILITIES | 2018 |
|
RU2702779C1 |
METHOD FOR CONSTRUCTING A PROTECTED COMMAND AND CONTROL CENTERS | 2018 |
|
RU2676342C1 |
METHOD OF BLOCK-MODULAR CONSTRUCTION OF STRUCTURES IN PITS | 2023 |
|
RU2811514C1 |
METHOD TO ERECT MULTISTORY SUBSURFACE STRUCTURE | 2009 |
|
RU2414563C1 |
LINING OF UNDERGROUND STRUCTURE OF REINFORCING- METAL BLOCKS | 1984 |
|
RU2114376C1 |
SUBWAY STATION AND METHOD OF ITS CONSTRUCTION (DEVICE AND METHOD NAMED AFTER YURKEVICH PB) | 2012 |
|
RU2505646C2 |
METHOD FOR ERECTION OF GRADE-CROSSING ELIMINATION STRUCTURE | 1999 |
|
RU2152472C1 |
METHOD FOR ERECTING ROAD INTERCHANGE | 1999 |
|
RU2175366C2 |
METHOD OF ERECTION AND ARRANGEMENT OF A SINGLE-SPAN UNDERGROUND METRO STATION OF AN OPEN METHOD OF PERFORMING WORKS | 2019 |
|
RU2715497C1 |
METHOD FOR ERECTION OF UNDERGROUND STRUCTURE | 1999 |
|
RU2138597C1 |
Authors
Dates
1999-06-10—Published
1997-07-10—Filed