KNOCKOUT DRUM INSTALLED IN WELL BORE Russian patent published in 2008 - IPC E21B43/38 

Abstract RU 2329375 C2

FIELD: mining.

SUBSTANCE: facility incorporates an inner pipe for flowing of fluid removed from gas. The pipe is installed in the external pipe and forms with the said external pipe an annular clearance for free gas flowing. The facility is additionally equipped with a plate, which has a breakpoint and at least partially surrounds the said external pipe to form a curved flow passage for produced fluid mixture; an annular clearance inlet of aforesaid breakpoint for free gas flow, in this case, the external pipe has an extended part, located next to the annular clearance inlet and expanding as the said extended part goes from the breakpoint of the plate; the inlet of the internal pipe made below the breakpoint for flow of fluid removed from gas and fluid mixture containing gas and hydrocarbon liquid. The fluid mixture is transferred from the productive zone into the well, which has an external pipe located in the said well and an extended part in its lower end part. Below this part, a disc plate furnished with a good few openings is disposed. According to this method, the following procedures are carried out: transference of fluid via the passage at least partially covering the said external pipe to spin aforesaid fluid mixture around the external pipe; separation of the part of gas from the said hydrocarbon liquid in response to spinning of fluid mixture to produce free gas, press it at the end part of the external pipe, stop free gas twirl caused by disc plate and ensure conditions of its upraise with fluid removal from gas; transference of the said separated free gas via the external pipe.

EFFECT: centrifugal separation of produced fluid mixture into gasses and liquids.

24 cl, 11 dwg

Similar patents RU2329375C2

Title Year Author Number
FLOW REGULATION OF MULTIPHASE FLUID MEDIUM, SUPPLIED FROM WELL 2005
  • Ehken Adrian Nikolas
RU2386016C2
DOWNHOLE GAS SEPARATOR ASSEMBLY (VARIANTS), METHOD OF ITS USE 2018
  • Ellitorp, Brajan
RU2819693C1
PLANT TO PUMP TWO-PHASE GAS AND FLUID MIXTURE OUT OF WELL 1998
  • Bokehn Zhan-Lui
RU2201535C2
PUMPING-EJECTOR UNIT FOR OPERATING WELLS 2017
  • Sazonov Yurij Appolonevich
  • Mokhov Mikhail Albertovich
  • Frankov Mikhail Aleksandrovich
  • Tumanyan Khoren Arturovich
RU2674042C1
WELL DRILLING METHOD 2003
  • Khed Filip
  • Luri Pol Dzhordzh
RU2320840C2
METHOD AND DEVICE FOR EXTRACTING PETROLEUM GAS FROM SEDIMENTARY ROCKS WITH GAS HYDRATE INCLUSIONS 2022
  • Korabelnikov Mikhail Ivanovich
  • Vaganov Yurij Vladimirovich
  • Aksenova Natalya Aleksandrovna
  • Korabelnikov Aleksandr Mikhajlovich
RU2803769C1
METHOD FOR EXTRACTION OF CONVENTIONAL AND HYDRATED GAS OF MULTI-FORMATION DEPOSIT AND DEVICE FOR ITS IMPLEMENTATION 2023
  • Fursin Sergei Georgievich
  • Gneush Vladislav Sergeevich
  • Al-Idrisi Mokhammed Salekh Abdullakh Khaled
RU2819884C1
OVERPRESSURE PROTECTION SYSTEM 2017
  • Ensen, Tord
  • Khalsejd, Rune
RU2738699C2
METHOD FOR COMPLETING UNDERGROUND FORMATIONS AND SYSTEM FOR REALIZATION OF SAID METHOD 2000
  • Snajder Filip
  • Villilamz Ehldon Dzhr.
RU2249681C2
DEVICE FOR SUSPENSION OF STEEL AND POLYMER PIPE AND METHOD OF ITS USE 2014
  • Klimenchenkov Aleksej Aleksandrovich
  • Imshenetskij Mikhail Anatol'Evich
  • Filippov Andrej Gennad'Evich
  • Minlikaev Valerij Zirjakovich
  • Dikamov Dmitrij Vladimirovich
  • Shuljatikov Igor' Vladimirovich
RU2558354C1

RU 2 329 375 C2

Authors

Kholl Dzhered S.

Tomlinson Dzhejms A.

Ehllvud Dehjvid E.

Dates

2008-07-20Published

2003-08-15Filed