FIELD: mining industry.
SUBSTANCE: method includes detonation of first perforation cannon plant, positioned outside from casing pipe in well, as a result casing pipe and first underground formation are perforated. One or more stimulating and/or effecting substances is injected through casing pipe into first underground formation. Second perforation cannon plant is detonated, positioned outside casing pipe in well. As a result said casing string and second underground formation are perforated. One or more stimulating and/or effecting substances is injected through casing pipe into second underground formation. First underground formation is isolated from injection of flowing substances prior to injection of one or more stimulating and/or effecting substances into second underground formation. First and second perforation cannon plants are cemented in underground well prior to detonation. First underground formation is isolated from injection of flowing substances after injection of one or mote stimulating and/or effecting substances through casing pipe into second underground formation. Explosive substance is set on fire by detonation of at least one explosive charge by control line, placed in underground well outside of said casing pipe and connected to at least one explosive charge. Completion system has casing pipe, at least two perforation cannons, connected to outside of casing pipe. Each perforation cannon has at least one explosive charge, targeted in direction of casing pipe. Also provided is device for isolating a zone, positioned between at least two perforation cannons for selective overlapping of flow through casing pipe. Outside the casing pipe a plant for sending signals to perforation cannons is positioned.
EFFECT: higher efficiency.
2 cl, 40 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF WELL COMPLETION IN UNDERGROUND FORMATION (VERSIONS) | 2005 |
|
RU2375561C2 |
METHOD AND SYSTEM FOR PROCESSING OPERATION PERFORMING IN WELL | 2001 |
|
RU2272907C2 |
PROCEDURE FOR INCREASED PRODUCTION OF METHANE FROM COAL BEARING STRATA BY RAPID OXIDATION (VERSIONS) | 2007 |
|
RU2427707C2 |
METHOD AND SYSTEM FOR PRESSURE CONTROL IN UNDERGROUND FORMATIONS | 2008 |
|
RU2393340C1 |
METHOD AND COMPONENT USED WITH EXPLOSIVES | 2000 |
|
RU2258801C2 |
METHOD AND DEVICES TO CREATE TRANSITION PRESSURE CONDITION INSIDE WELL BORE | 2005 |
|
RU2310067C2 |
ASSEMBLY AND METHOD FOR FLOW INTENSIFICATION BY HYDRAULIC FRACTURING IN SEVERAL ZONES USING INDEPENDENT UNITS IN PIPE SYSTEMS | 2011 |
|
RU2571460C2 |
PROCEDURE AND DEVICE FOR INTRAWELL SELECTIVE COMMUNICATION BY MEANS OF FLUID MEDIUM | 2007 |
|
RU2401936C1 |
MULTIZONE WELL COMPLETION METHOD AND SYSTEM (VARIANTS) | 2005 |
|
RU2310066C2 |
METHOD AND DEVICE FOR REMOTE INTERVENTION BY MEANS OF LOGIC VALVE CONTROL | 2003 |
|
RU2358090C2 |
Authors
Dates
2005-04-10—Published
2000-03-03—Filed