FIELD: physics.
SUBSTANCE: current is cutoff to soil through two point sources. The first source is placed close by vertical interface, and the second is taken to infinity. Position of one equipotential line of electric field is detected. Measuring electrodes is mounted by tangent to equipotential line symmetrically to tangency point of ray lined from auxiliary point presenting mirror reflection of point source relative to interface with specified equipotential. Besides, measuring electrodes can be placed by line, perpendicular to interface symmetrically to power supply provided close by interface. Near to interface there is compensatory point source with current value fixed by parity where I0, Ik are currents from the first and compensatory sources, ΔΨ1MN is differential of the space function that determinates position of measuring electrodes relative to the first source, ΔΨ2MN is differential of space function that determinates position of measuring electrodes relative to compensatory source. Measuring electrodes voltage indicates time variations of resistivity.
EFFECT: simplified positioning of electrical survey unit and improved measurement accuracy.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF MEASURING TEMPORARY CHANGES OF EARTH SPECIFIC RESISTANCE | 0 |
|
SU1048439A1 |
METHOD FOR GEODYNAMIC MONITORING AND DEVICE FOR ITS IMPLEMENTATION | 2021 |
|
RU2784418C2 |
METHOD OF MONITORING CONTROL OF THE PHYSICAL STATE OF A GEOLOGICAL ENVIRONMENT | 2015 |
|
RU2650084C2 |
GEOLOGICAL SURVEY MEASURING DEVICE | 1993 |
|
RU2087927C1 |
METHOD OF EXCITING ELECTROMAGNETIC FIELDS IN ELECTRIC GEORSURVEY | 0 |
|
SU840778A1 |
METHOD OF ELECTRIC PROBING | 0 |
|
SU1518819A1 |
MARINE ELECTRICAL EXPLORATION METHOD AND DEVICE FOR ELECTRICAL EXPLORATION DURING MOVEMENT OF VESSEL | 2007 |
|
RU2425399C2 |
PROCESS OF OBTAINING TOMOGRAPHIC PICTURE BY METHOD OF MAGNETIC INDUCTION TOMOGRAPHY | 1996 |
|
RU2129406C1 |
0 |
|
SU43094A1 | |
METHOD FOR ELECTRICAL MONITORING OF RESERVOIR-COLLECTOR CHARACTERISTICS DURING DEVELOPMENT OF OIL DEPOSITS USING STEAM PUMPING | 2018 |
|
RU2736446C2 |
Authors
Dates
2008-09-20—Published
2006-07-10—Filed