FIELD: technological processes; construction.
SUBSTANCE: on press table packet of multi-layered panel workpieces is assembled, every of which is arranged from the pair of oriented strand boards, which are adhered to porous material installed between them. Plates are taken with different extent of side roughness and are installed with their rougher side to the side of porous material. Packet of panels is kept on air for 5-15 minutes and pressed under pressure of 0.15-0.17 MPa for 40-60 minutes.
EFFECT: increase of construction panels strength.
1 tbl, 5 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR INSTALLATION OF STRUCTURES FROM MULTI-LAYER CONSTRUCTION PANELS | 2007 |
|
RU2346125C1 |
MULTI-LAYERED STRUCTURES MANUFACTURING METHOD | 2017 |
|
RU2678814C1 |
METHOD FOR MANUFACTURING OF MULTI-LAYER PANEL | 2008 |
|
RU2368506C1 |
METHOD OF PRODUCING LAYERED PANELS | 2005 |
|
RU2291057C1 |
CONSTRUCTION PRODUCT FACING METHOD | 2000 |
|
RU2189320C2 |
FLOW LINE FOR MAKING LAMINATED CONSTRUCTION PANELS | 0 |
|
SU939209A1 |
MANUFACTURING METHOD OF STRUCTURAL DECORATIVE SHEET PANEL (VERSIONS) | 2014 |
|
RU2580115C2 |
WOODEN PREFABRICATED GLUED WALL PANEL | 2023 |
|
RU2811652C1 |
METHOD OF MANUFACTURE OF PANEL THREE-LAYER STRUCTURE | 2012 |
|
RU2560374C1 |
METHOD FOR MANUFACTURING A LAMINATED WOOD MATERIAL | 2022 |
|
RU2796684C1 |
Authors
Dates
2008-10-10—Published
2007-03-20—Filed