FIELD: technological processes, tool.
SUBSTANCE: tool is arranged in the form of two symmetrically installed stamp holders and set of split pair inserts installed in contact with them along support surfaces, which are installed with the possibility of coupling and creation of internal shape-generating surface, support installed on the outer end of upper insert that is extreme according to travel, and limiting plate installed inside the mentioned upper insert and fixed in support with the help of bars with the possibility of control of its distance from the end of upper insert. At that longitudinal axis of limiting plate coincides with transverse axis of shape-generating surface of upper insert, and its length exceeds the distance between the walls of tubular billet.
EFFECT: accuracy of tubular billet installation into stamping tool is increased, as well as quality of pipes press molding.
3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF FINAL MOLDING OF LARGE DIAMETER PIPES OF U-SHAPED BILLET AND DEVICE FOR ITS REALISATION | 2006 |
|
RU2340422C2 |
DIE TOOL FOR PRESSING LARGE-DIAMETER TUBES | 2000 |
|
RU2189881C2 |
METHOD OF MAKING STRAIGHT-SEAM ELECTRICALLY WELDED LARGE DIAMETER TUBES FOR TRANSPORTING ABRASIVE LOOSE MATERIALS AND PULPS AND APPARATUS FOR PERFORMING THE SAME | 1992 |
|
RU2087226C1 |
METHOD AND DEVICE FOR STAMPING BLINGS | 2021 |
|
RU2769333C1 |
TEST BED FOR MOULDING TUBES FROM A SHEET OF LIMITED LENGTH | 0 |
|
SU1391752A1 |
EQUAL-PASS T-PIECE FORMING APPARATUS | 2006 |
|
RU2311982C1 |
BELLOWS MANUFACTURE APPARATUS | 2000 |
|
RU2191651C2 |
METHOD OF MAKING BLOWER COMPOSITE BLADE LEADING EDGE STRAP | 2012 |
|
RU2503519C1 |
METHOD OF MAKING STRAIGHT-SEAM ELECTRICALLY WELDED LARGE-DIAMETER TUBES | 1992 |
|
RU2057603C1 |
METHOD OF PRODUCTION OF STEEL PIPE AND PRESSING DIE USED IN THIS METHOD | 2015 |
|
RU2663674C1 |
Authors
Dates
2008-12-10—Published
2006-10-10—Filed