FIELD: construction, pipeline.
SUBSTANCE: invention is related to construction of pipeline transport and is used in construction of main pipelines, fast construction of roads, aerodromes, site objects. On prepared soil elastic layer is installed and fastened, which has been prepared by means of successive growth, - the base that consists of soil modules with cell structure. Along both sides of main pipeline (MT) forming walls of artificial trench are installed as rows of soil modules - GP. Every row of GP is formed with one or several GP cell structures filled with soil, at that space between rows of GP together with installed MT is filled with soil with creation of levee. Versions are given of MT bases, as well as methods of their construction.
EFFECT: higher reliability of MT, no necessity in application of additional mineral soil.
26 cl
Title | Year | Author | Number |
---|---|---|---|
METHOD OF FONDATION BUILDING, FOUNDATION AND FOUNDATION MODULE | 2006 |
|
RU2338834C2 |
METHOD FOR DRIVING A GAS MAIN IN MAN-MADE TRENCH AT PERMAFROST SOIL TERRITORY (VARIANTS) AND DEVICE FOR REALIZATION OF METHOD (VARIANTS) | 2006 |
|
RU2303736C1 |
HEAT-SHIELDING SET FOR UNDERGROUND PIPELINE | 2008 |
|
RU2346199C1 |
METHOD TO ERECT FOUNDATION, FOUNDATION AND DEVICE FOR ITS REALISATION | 2011 |
|
RU2462640C1 |
METHOD AND DEVICE FOR LAYING PIPELINE | 2005 |
|
RU2274793C1 |
EARTH MODULE OF FOREST MEADOW FOR CONSTRUCTION OF TECHNOLOGICAL PASSAGE ALONG ROUTE OF MANIFOLD PIPELINE | 2008 |
|
RU2353847C1 |
GROUND MODULE (VERSIONS) | 2015 |
|
RU2600426C1 |
METHOD OF LAYING PIPE LINES (VERSIONS) AND DEVICE FOR REALIZATION OF THIS METHOD | 2004 |
|
RU2244191C1 |
METHOD OF BUILDING TECHNOLOGICAL PASSAGEWAY ALONG MAINS ROUTE (VERSIONS) | 2003 |
|
RU2221953C1 |
HIPPODROME COATING AND CELLULAR DESIGN FOR COATING STABILISATION | 2005 |
|
RU2328571C2 |
Authors
Dates
2008-12-10—Published
2007-07-19—Filed