FIELD: construction.
SUBSTANCE: group of inventions relates to construction and can be used in construction of main pipelines in swamps, in the area of distribution of permanently frozen soils, at fast construction of roads, aerodromes and other objects of engineering infrastructure. Ground module comprises at least five X-located cells made of flexible elements and equipped with protective walls and an inserted bottom, which is connected to cells facets or ribs. Cells are filled with fill ground. Invention allows extending the range of technical facilities, increasing carrying capacity of bases of main pipelines, roads, and other structures, and also increases lifetime, reduces costs and time for maintenance of abuilding industrial sites.
EFFECT: method enables to avoid using imported mineral ground owing to using local ground.
13 cl, 8 dwg
Title | Year | Author | Number |
---|---|---|---|
GROUND MODULE (VERSIONS) | 2017 |
|
RU2678471C2 |
HIPPODROME COATING AND CELLULAR DESIGN FOR COATING STABILISATION | 2005 |
|
RU2328571C2 |
METHOD TO ERECT FOUNDATION, FOUNDATION AND DEVICE FOR ITS REALISATION | 2011 |
|
RU2462640C1 |
METHOD OF FONDATION BUILDING, FOUNDATION AND FOUNDATION MODULE | 2006 |
|
RU2338834C2 |
METHOD OF REINFORCEMENT OF LOOSE GROUNDS OF BASES AND SLOPES (VERSIONS) AND GEO-GRATE FOR REALIZATION OF THIS METHOD | 2003 |
|
RU2228479C1 |
ARTIFICAL TRENCH FOR MAIN PIPELINE, METHOD OF ITS BASE CONSTRUCTION (VERSIONS), BASE (VERSIONS), AND DEVICE FOR BASE CONSTRUCTION | 2007 |
|
RU2340824C1 |
METHOD AND DEVICE FOR LAYING PIPELINE | 2005 |
|
RU2274793C1 |
METHOD AND DEVICE FOR UNDERGROUND PIPELINE LAYING | 2005 |
|
RU2269711C1 |
METHOD FOR DRIVING A GAS MAIN IN MAN-MADE TRENCH AT PERMAFROST SOIL TERRITORY (VARIANTS) AND DEVICE FOR REALIZATION OF METHOD (VARIANTS) | 2006 |
|
RU2303736C1 |
POLYMERIC-CONTAINER BALANCING DEVICE FOR PIPELINE | 2005 |
|
RU2274794C1 |
Authors
Dates
2016-10-20—Published
2015-07-03—Filed