FIELD: technological processes; metallurgy.
SUBSTANCE: liquid fuel and water are supplied in reservoir 8. Pump 18 and disperser 14 are switched on, valves 15 are opened, which connect reservoir 8 with circular manifold 12. Water-fuel emulsion (WFE) is prepared in reservoir 8. Then WFE is supplied to burner equipped with hydromechanical nozzles, tube furnace. After reservoir 8 is emptied, appropriate valves 16 are switched on, and supply of WFE is switched to reservoir 9.
EFFECT: reduction of maximum temperature in burning torch and provision of possibility to use non-heatproof steels for furnace design elements.
3 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
INSTALLATION FOR BURNING FUEL HEATING PROCESSING MEDIA | 2011 |
|
RU2444678C1 |
PIPE STILL | 2008 |
|
RU2375656C1 |
TUBE KILN | 2008 |
|
RU2385896C1 |
OIL HEATING FURNACE | 1996 |
|
RU2090810C1 |
TUBULAR FURNACE FOR FIRE HEATING OF OIL PRODUCTS | 1998 |
|
RU2140434C1 |
METHOD OF PROCESSING AND USING HYDROCARBON WASTES | 2001 |
|
RU2204761C2 |
DEVICE FOR PREPARING AQUEOUS FUEL EMULSIONS | 0 |
|
SU1724340A1 |
TUBULAR FURNACE | 2014 |
|
RU2585902C2 |
METHOD FOR DIAGNOSING OIL PRODUCT LEAKAGE FROM A COIL DURING FIRE HEATING IN A PIPE FURNACE | 2021 |
|
RU2762597C1 |
VERTICAL CYLINDRICAL CONVECTION TUBULAR FURNACE FOR THE SMALL TONNAGE OIL-PROCESSING PRODUCTIONS | 2005 |
|
RU2294953C1 |
Authors
Dates
2009-01-10—Published
2007-01-29—Filed