FIELD: mining.
SUBSTANCE: facility consists of pipelines of oil well production supply to distributing unit connected by means of steadying collector with preliminary separation unit, which by means of output sleeves of preliminary separated gas, oil and water is connected with oil-gas separator, equipped with pipelines of gas, oil and water output. The device for withdrawing and supply of part of dry oil is furnished with an itinerary oil heater and with a dozing and supplying block of chemical reagent.
EFFECT: upgraded efficiency of facility, increased quality of water purification, reduced consumption of demulsifier and increased oil gas utilisation.
5 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR PRELIMINARY DEHYDRATION OF BITUMEN | 2006 |
|
RU2316376C1 |
METHOD FOR DISCHARGE OF ASSOCIATED-PRODUCED WATER AND GAS SEPARATELY IN CLUSTER OF WELLS OF OIL DEPOSIT | 2019 |
|
RU2713544C1 |
METHOD FOR PRELIMINARY DISCHARGE OF PRODUCED WATER AND A PIPE PHASE DIVIDER FOR ITS IMPLEMENTATION | 2021 |
|
RU2763097C1 |
PROCEDURE FOR COLLECTION AND TRANSPORTING MULTI-PHASE MIXTURE FROM REMOTE CLUSTERS OF WELLS | 2009 |
|
RU2411409C1 |
TUBE SEPARATION INSTALLATION | 2008 |
|
RU2361641C1 |
COMPLEX CLUSTER INSTALLATION FOR DEHYDRATION OF OIL AND PURIFICATION AND UTILISATION OF PRODUCED RESERVOIR WATER | 2009 |
|
RU2411055C1 |
SYSTEM FOR COLLECTING AND PREPARING CRUDE OIL | 0 |
|
SU969283A1 |
METHOD OF DEHYDRATING CRUDE OIL | 1996 |
|
RU2095119C1 |
HEAVY OIL TREATMENT PLANT (VERSIONS) | 2011 |
|
RU2471853C1 |
SEPARATION PLANT | 2005 |
|
RU2296609C2 |
Authors
Dates
2009-01-20—Published
2007-08-17—Filed