FIELD: oil industry.
SUBSTANCE: invention can be used at oil treatment plants in oil fields for the preparation for processing of gas, water and oil emulsion coming from wells. The method for preliminary discharge of produced water includes the transportation of a gas water and oil mixture through a pipeline into a branch pipe (3) for the introduction of a gas, water and oil mixture of a pipe divider (1) of phases with the separation of oil and gas from water. The maintenance of a certain position of the oil-water phase interface in the pipe phase divider (1) and the subsequent discharge of separated water from the bottom of the pipe phase divider through the water outlet (4) and the removal of oil and gas from the pipe phase divider are provided. Previously, the pipe phase divider (1) is placed buried in the ground to a depth of 1.7-1.8 m and installed at an angle of 3-6 ° to the horizon. The gas, water and oil mixture is introduced from the lower part of the pipe phase divider. The removal of oil together with gas is carried out from the upper part of the pipe phase divider. The branch pipes (3) and (4) of the gas, water and oil mixture inlet and water intake in the upper part are equipped with manifolds (6) and (7). The manifolds (6) and (7) are made in the form of disc-shaped cylinders, muffled from below and equipped with a number of perforated holes placed along the vertical cylindrical surface of the manifold. A dividing transverse partition (2) is installed to the upper part of the pipe divider (1) of the phases, covering 2/3 of its passage section with the possibility of water movement. The pipe phase divider is opened.
EFFECT: accelerating the natural decay of gas, water and oil emulsions.
2 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DISCHARGE OF ASSOCIATED-PRODUCED WATER AND GAS SEPARATELY IN CLUSTER OF WELLS OF OIL DEPOSIT | 2019 |
|
RU2713544C1 |
TUBULAR PHASE SEPARATOR | 2007 |
|
RU2369425C1 |
OIL WELL PRODUCTS COMPLEX TREATMENT SYSTEM AND METHOD OF ITS IMPLEMENTATION | 2001 |
|
RU2232935C2 |
METHOD FOR PREPARING AERATED WATER FOR FORCING INTO BED PRESSURE SUPPORT SYSTEM AND TECHNOLOGICAL COMPLEX FOR REALIZATION OF SAID METHOD | 2005 |
|
RU2293843C2 |
METHOD FOR PRELIMINARY PHASE SEPARATION OF HIGH-VISCOUS GAS-WATER-PETROLEUM EMULSION | 0 |
|
SU1809911A3 |
UNIT SET FOR CLUSTER SEPARATION | 2020 |
|
RU2741296C1 |
TUBULAR PHASE DIVIDER | 1998 |
|
RU2134607C1 |
INSTALLATION OF DISCHARGE OF THE ASSOCIATED WATER | 2005 |
|
RU2314140C2 |
METHOD FOR OIL PREPARATION AND MEANS FOR REALIZATION OF SAID METHOD | 2002 |
|
RU2238403C2 |
PRODUCED WATER DISCHARGE METHOD AT WELL PADS | 2013 |
|
RU2531310C1 |
Authors
Dates
2021-12-27—Published
2021-04-01—Filed