FIELD: oil and gas industry.
SUBSTANCE: invention is related to oil industry and may find application in operation and making of well horizontal hole in oil beds, where areas of drilling agent absorption are available. Substance of invention: when isolating area of complete drain, at first mixture of oil, cement and calcium chloride is pumped in the following ratio: oil:cement:calcium chloride as 1:(1-4):(0.002-0.24) by volume - accordingly in volume of 6-12 m3. Mixture is held for 12-14 hours. Then cement mortar is pumped in, containing 2-6% of calcium chloride in volume of 6-18 m3 and held for up to 2 days. Well operation in the first 10 days in done at minimum flows and pressures, at which well operation is possible.
EFFECT: better reliability of complete drilling agent drain area isolation, increase of well debit and reduction of time required for oil resources workout.
1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR WELL CONSTRUCTION IN COMPLICATED CONDITIONS | 2016 |
|
RU2630519C1 |
METHOD FOR SELECTIVE ISOLATION OF WATER INFLOWS IN OIL WELLS | 1999 |
|
RU2136879C1 |
METHOD FOR OPENING HIGH-PRESSURE FORMATIONS SATURATED WITH STRONG BRINES | 2020 |
|
RU2735504C1 |
METHOD OF CREATING SCREENING CURTAIN WHEN DRILLING HIGH-PRESSURE STRATA SATURATED WITH STRONG CHLORIDE-CALCIUM BRINES | 2020 |
|
RU2735508C1 |
ISOLATION METHOD OF BRINE WATER INFLUX IN WELL | 2012 |
|
RU2488692C1 |
CONSTRUCTION METHOD OF WELL OF SMALL DIAMETRE | 2010 |
|
RU2407879C1 |
METHOD OF RESTORATION OF WATER-FLOODED GAS OR GAS CONDENSATE WELL AFTER HYDRAULIC FRACTURING OF FORMATION | 2019 |
|
RU2740986C1 |
METHOD FOR HORIZONTAL WELL OPERATION | 2011 |
|
RU2447265C1 |
METHOD FOR PROCESSING THE BOTTOM-HOLE ZONE OF A PRODUCTIVE LAYER SATURATED WITH HYDROCARBONS WITH RESIDUAL HIGHLY MINERALISED PORE WATER | 2020 |
|
RU2757456C1 |
METHOD OF HORIZONTAL WELL OPERATION | 2007 |
|
RU2335621C1 |
Authors
Dates
2009-01-20—Published
2008-01-18—Filed